Government announces Trajectory to achieve its targets of commissioning 100 GW of Solar generating capacity and 60 GW of Wind power by 2022 Updated On Fri, Nov 24th, 2017 by Saurenergy Government to conduct Third Wind Power Auction of 2000 MW Capacity Power Supply Agreements signed by SECI with utilities of UP, Bihar, Jharkhand, Assam, Punjab, Goa and Odisha The Government today announced the trajectory for achieving its targets of commissioning 175 GW of Renewable Energy (RE), 100 GW of solar generating capacity and 60 GW […] Read more
India gets Lowest Wind Tariff of Rs. 2.64 per kWh in second Wind Auction of 1000 MW Updated On Thu, Oct 5th, 2017 by Saurenergy The wind tariff in India touched lowest level of Rs.2.64 per kWh in the second wind auction conducted by the Solar Energy Corporation of India (SECI) on behalf of Ministry of New & Renewable Energy, Government of India yesterday. The tariff discovered is much lower than first wind auction concluded at Rs. 3.46 per kWh […] Read more
PPAs signed for first Wind Auction totalling 1050 MW Updated On Fri, Jul 21st, 2017 by Saurenergy Union Minister of State (IC) for Power, Coal, New & Renewable Energy and Mines, Shri Piyush Goyal presided over the signing of Power Purchase Agreements (PPAs) for purchase of 1050 MW of wind power under Ministry of New and Renewable Energy (MNRE)’s first Wind Auction Scheme here today. The PPAs were signed between PTC India […] Read more
Green Stocks Jan 15: Stuttering Recovery Continues Updated On Wed, Jan 15th, 2025 by Saurenergy After the strong rebound that we saw yesterday, as expected, the movement was a lot more sporadic and cautious today. So where Adani Green Energy and KPI Green rose on the back of news on commissioning capacities and order wins respectively, Premier Energies also bucked the downtrend with the announcement of multiple order wins. Tomorrow […] Read more
Adani Subsidiary Commissions 57.2 MW Hybrid Project At Khavda Updated On Tue, Jan 14th, 2025 by Saurenergy Adani Renewable Energy Forty Eight Limited, a step-down subsidiary of Adani Green Energy Limited (AGEL) has commissioned a 57.2 MW wind power component. This component is part of its wind-solar hybrid project at Khavda, Gujarat. The company informed its investors about its latest development today. In its regulatory filing before the exchanges, it said, “With […] Read more
Green Stocks Jan 10: Retreat Turns To Rout As Selling Pressure Continues Updated On Fri, Jan 10th, 2025 by Saurenergy Like a Self-fulfilling prophecy, days of continuous falls have finally established a pattern of more selling in green stocks as well. On the last day of the week, it was time for many investors to sit on the fence, hoping for even more drops, as the fall continued unabated. It was a day when the […] Read more
Green Stocks Dec 11: EPCs Up, Developers Down Updated On Wed, Dec 11th, 2024 by Saurenergy In a role reversal of sorts, solar EPC firms enjoyed their day in the sun today, even as green developers, who had started the week on a bright note, faced selling pressure. All of KPI Green, SWREL, and Waaree RTL enjoyed a day with some gains, especially Shakti Pumps, which made a decisive 5% up […] Read more
Khavda: GE Vernova Gets Rs. 400 Cr Order From Sterlite Power Updated On Tue, Dec 10th, 2024 by Saurenergy GE Vernova recently secured an order worth approximately ₹400 crore from Sterlite Power. The US-based wind energy company will supply and supervise 765 kV power transformers and reactors for the Khavda project. GE Vernova plans to execute the project within two years. Wind turbine manufacturers in India have been increasing the upper capacity limit of […] Read more
Green Stocks Nov 28: Adani Bounce Back Continues, NTPC Green Shines Updated On Thu, Nov 28th, 2024 by Saurenergy Following its strong recovery yesterday, Adani Green Energy continued its sharp recovery, rising 10% again today. Keeping it company was the newly listed NTPC Green, which rose almost 5% to 127 on the back of a project commissioning. Waaree Renewable Technologies powered up 5% after its announcement late last evening of a 2 GW project. […] Read more