RBI Releases Guidelines To Banks For Acceptance Of Green Deposits Updated On Wed, Apr 12th, 2023 by Saurenergy The Reserve Bank of India (RBI) has issued a dedicated set of guidelines to the Indian banks and Non-Banking Financial Institutions (NBFCs) for accepting green deposits effective June 1, 2023. The move will likely boost the country’s financing of renewable energy projects. As per the mandate of the RBI, the financial institutions will extend the […] Read more
EV Charging Hub in Kolkata That Fast-Charges 25 Vehicles At The Same Time Updated On Wed, Apr 12th, 2023 by Saurenergy West Bengal Housing Infrastructure Development Corporation (WBHIDCO) has joined hands with Powerbank for the establishment of charging hub for EVs in Kolkata. The firm maintains that this is the largest public fast charging hub for EVs in the eastern part of India. Powerbank is a firm that sets up EV charging networks. The EV hub that […] Read more
Sembcorp Awards 50.4 MW Wind Power Project to Suzlon Updated On Wed, Apr 12th, 2023 by Saurenergy Renewable energy solutions provider Suzlon Group has announced a new order win for the development of a 50.4 MW wind power project for Sembcorp’s renewables subsidiary Green Infra Wind Energy Limited. The firm will be responsible for installing 24 wind turbine generators (WTGs) with a Hybrid Lattice Tubular (HLT) tower and a rated capacity of […] Read more
Ministry Of Power Appoints CEA To Verify Captive Status of ISTS Power Projects Updated On Wed, Apr 12th, 2023 by Saurenergy The Ministry of Power, in its latest notification, has nominated the Central Electricity Authority (CEA) as the competent authority for verifying the status of captive power generating plants involved in inter-state power transmission. The notification said that the ministry earlier had received references on the issue from different stakeholders to decide on the authority to […] Read more
System Design Engineer Updated On Wed, Apr 12th, 2023 by Saurenergy In-house drawings and technical specifications for electrical works (BOM, BOQ, RFP) Design & Drawing of electrical systems for medium and large-scale PV systems (DC, AC, LV, HV, communication systems/SCADA, Earthing, Lightning protection and Illumination Calculation). Preparation of Design Documents such as RFP, GTP etc. Preparation of drawing for various projects such as Conceptualization, Tendering, Execution […] Read more
HSS Manager (Solar) Updated On Wed, Apr 12th, 2023 by Saurenergy In the role as HSS Manager (Solar), we are seeking a competent, self-driven and committed individual to deliver comprehensive technical support in occupational health safety, security to the project & assets, ensuring effective control of risk, impact and follow up of management plans for full compliance with regulations to minimize the occurrence of impacts or incidents […] Read more
Engineering Manager-Hydro Updated On Wed, Apr 12th, 2023 by Saurenergy In the role as an Engineering Manager-Hydro, we are seeking a competent, self-driven and committed individual to ensure that projects under development and construction receive the required support in areas of hydropower planning, design related issues and reporting to Statkraft standards. The Hydro Power Engineer will be an integral role in technical team during all phases of M&A, project […] Read more
HSS Manager Updated On Wed, Apr 12th, 2023 by Saurenergy In the role as HSS Manager, we are seeking a competent, self-driven and committed individual to deliver comprehensive technical support in occupational health safety, security to the project & assets, ensuring effective control of risk, impact and follow up of management plans for full compliance with regulations to minimize the occurrence of impacts or incidents that […] Read more
Powerica Ltd Entitled To Compensation Due To Rise of GST Rates Post-Contract, Rules CERC Updated On Tue, Apr 11th, 2023 by Saurenergy The Central Electricity Regulatory Commission (CERC), in its latest Order, while hearing a petition filed by Powerica Limited, has ruled that the change of Goods and Service Tax (GST) rates after receiving a contract was a deemed case of ‘change of law.’ Accordingly, the regulatory body also ordered compensation to the wind energy company on […] Read more