Engineering Director Vehicle Electrification Updated On Tue, Oct 15th, 2024 by Saurenergy Eaton India Innovation Center (EIIC) is looking for executive leader, who will lead engineering team responsible for vehicle electrification portfolio and drive regional manufacturing / sourcing growth. This position is based at our office in Magarpatta City, Pune. The role has to step up to provide leadership and guidance on several initiatives for Industrialization, also […] Read more
Product Engineer (Aero-HYD Pumps & Motors) Updated On Tue, Oct 15th, 2024 by Saurenergy Eaton India Innovation Center (EIIC) – Aeropace FMC Hydraulics Business has an ‘Engineer’ open position. The incumbent in this position is responsible for the successful execution of a wide range of Aerospace Hydraulics projects, including New Product Introduction, VAVE, B&P, and Sustaining Engineering, while driving continuous improvement to meet project KPIs (Focus 5, NPI Efficacy), […] Read more
Q2 Results: Sterling & Wilson Renewable Reports Higher Revenues, PAT Updated On Mon, Oct 14th, 2024 by Saurenergy Public-listed renewable energy company Sterling & Wilson announced its financial results for Q2 of FY25 today. The consolidated financial results showed an increase in total revenues and net profits. The company reported total revenue of Rs 1,064 crore in Q2FY25, compared to Rs 927.89 crore in Q1FY25 and Rs 776.73 crore in Q2FY24. This represents […] Read more
Sr. Engineer – O&M – Solar Updated On Mon, Oct 14th, 2024 by Saurenergy Daily monitoring the functions of all electrical equipment’s. All reports to be maintain as per site requirement. Subcontractor Management. Regular trainings to subordinates for their development as per site Store/Spares Management. Schedule and execute the Planned Preventive Maintenance (PPM) Attending of Breakdown maintenance at minimal duration. Annual testing Reporting to Project Manager. Quality Management System […] Read more
Credence, Krannich Partner To Supply MonoPERC & Topcon Modules Updated On Mon, Oct 14th, 2024 by Saurenergy Gujarat-based Credence Solar, a PV module manufacturer, and Krannich Solar, a solar products distributor, entered a partnership to accelerate solar energy solutions adoption in India and in the international markets. As part of this collaboration, Krannich Solar will distribute Credence Solar’s Mono-PERC and TOPCon PV modules to its across India, Europe, and other key solar […] Read more
Green Stocks Oct 14: Gensol Stock Price Gets Max Gain Updated On Mon, Oct 14th, 2024 by Saurenergy On a day when most of the green energy companies reported a negative growth in their stock prices, only four companies showed growth in their stock prices. The highest growth was reported by Gensol Engineering which reported a growth of 3.45%. It was followed by Premier Energies which reported a growth of 2.31 percent. The […] Read more
ECMS-DCS Engineer Updated On Mon, Oct 14th, 2024 by Saurenergy Responsibilities:- You will be responsible for complete Project Life Cycle i.e. starting from inputs analysis, Design & Engineering, Testing & Factory Acceptance Test (FAT) followed by commissioning as per requirement. Project Engineering:- Collection and review of project inputs from the Front Office or from the customer site through e-mail, kick off meeting, site survey Executing […] Read more
Rooftop Solar Can Increase Local Temperature, Says Research Updated On Mon, Oct 14th, 2024 by Saurenergy A recent research showed that rooftop solar can raise temperatures during the daytime and lower them at nighttime. These findings were based on a city-wise simulation on photovoltaic solar panels on rooftops. The research indicated that the conventional photovoltaic solar panels may increase temperatures on hot days and lower them at night, said new modelling. […] Read more
Gautam Solar Eyes IPO Option As It Expands Capacity to 5 GW Updated On Mon, Oct 14th, 2024 by Saurenergy Gautam Solar, one of the oldest and largest solar module manufacturer in North India, has announced more details on its ambitious plan to expand its solar module manufacturing capacity to 5 GW by 2025. This expansion will occur in three phases, with the first phase set for completion in November 2024, followed by the second […] Read more