STATUS OF RFS : IMPLEMENTATION OF 97.5MW GRID CONNECTED ROOFTOP SOLAR PV SYSTEM SCHEME FOR GOVERNMENT BUILDINGS IN DIFFERENT STATES/ UNION TERRITORIES OF INDIA UNDER CAPEX/ RESCO MODEL Updated On Thu, Feb 21st, 2019 by Saurenergy This has reference to the NIT No. SECI/C&P/NIT/MNRE/97.5MW GCRT/IND/022019 regarding the Tender for Implementation of 97.5MW Grid Connected Rooftop Solar PV System Scheme for Government Buildings in different States/ Union Territories of India under CAPEX/ RESCO Model under Global Competitive Bidding. The detailed tender document are under preparation and shall be available for downloading from […] Read more
India & China Lead as Asia-Pacific Installs 24.9 GW of New Onshore Wind Capacity in 2018 Updated On Wed, Feb 20th, 2019 by Saurenergy Total installed onshore wind capacity in Asia-Pacific is now 256 GW, leading countries in the region for onshore installations in 2018 were China (21.2 GW) and India (2.2 GW). The latest data released by the Global Wind Energy Council (GWEC), a member-based organisation that represents the entire wind energy sector, shows that Asia-Pacific installed 24.9 […] Read more
Solar Crosses 28 GW Mark in India : BTI Updated On Wed, Feb 20th, 2019 by Saurenergy Only 1,446 MW of new capacity additions were made in the October-December 2018 period, of which 990 MW was in utility-scale solar and 456 MW in rooftop solar. India’s total solar energy generation capacity at the end of December, including the 3.85 GW rooftop segment, stood at 28.05 GW according to a report by the […] Read more
PRE-BID MEETING NOTIFICATION: TENDER FOR 20 MW (AC) FLOATING SOLAR PV POWER PLANT WITH 60 MWH BESS AT UNION TERRITORY, LAKSHADWEEP, INDIA Updated On Wed, Feb 20th, 2019 by Saurenergy Pre-Bid Meeting Notification: Tender for Design, Engineering, Supply, Construction, Erection, Testing & Commissioning of 20 MW (AC) Floating Solar PV Power Plant with 60 MWh BESS including 10 years Plant O&M at Union Territory, Lakshadweep, India This has reference to the NIT documents (NIT No. SECI/C&P/NIT/2019/LKRE dated 18.02.2019) regarding the Tender for Design, Engineering, Supply, Construction, […] Read more
An EV Charging Station Every 25 KM in India planned Updated On Mon, Feb 18th, 2019 by Saurenergy The ministry has made amendments to the Model Building Bye-laws (MBBL) 2016 and Urban Regional Development Plans Formulation and Implementation (URDPFI) Guidelines 2014, making provisions for establishing EV charging infrastructure. The government has issued a set of guidelines to set up charging stations for electric vehicles across the country, outlining ways to build such fuelling […] Read more
TENDER FOR 20 MW (AC) FLOATING SOLAR PV POWER PLANT WITH 60 MWH BESS INCLUDING 10 YEARS PLANT O&M AT UNION TERRITORY, LAKSHADWEEP, INDIA Updated On Mon, Feb 18th, 2019 by Saurenergy Owner: Solar Energy Corporation of India Limited (SECI), New Delhi, India Project: Deployment of SECI’s owned RE Projects at UT, Lakshadweep, India Tender title: Design, Engineering, Supply, Construction, Erection, Testing & Commissioning of 20 MW (AC) Floating Solar PV Power Plant with 60 MWh BESS including 10 years Plant O&M at Union Territory, Lakshadweep, India. NIT […] Read more
NIT FOR SETTING UP OF 1200 MW ISTS-CONNECTED WIND POWER PROJECTS IN INDIA (TRANCHE-VII) Updated On Fri, Feb 15th, 2019 by Saurenergy Solar Energy Corporation of India Ltd. (SECI) invites online bids for Setting up of 1200 MW ISTS Connected Wind Power Projects (Tranche-VII) on a pan India basis. The detailed Request for Selection Document (RfS) shall be available for downloading by 22.02.2019 onwards on www.tcil-india-electronictender.com. Prospective bidders are requested to remain updated for any notices/amendments/clarifications etc. to the […] Read more
IMPLEMENTATION OF 97.5MW GRID CONNECTED ROOFTOP SOLAR PV SYSTEM SCHEME FOR GOVERNMENT BUILDINGS IN DIFFERENT STATES/ UNION TERRITORIES OF INDIA UNDER CAPEX/ RESCO MODEL Updated On Fri, Feb 15th, 2019 by Saurenergy This has reference to the NIT No. SECI/C&P/NIT/MNRE/97.5MW GCRT/IND/022019 regarding the Tender for Implementation of 97.5MW Grid Connected Rooftop Solar PV System Scheme for Government Buildings in different States/ Union Territories of India under CAPEX/ RESCO Model under Global Competitive Bidding. The detailed tender document are under preparation and shall be available for downloading from […] Read more
India & Germany To Provide Financial Support to Climate Conservation Projects Updated On Thu, Feb 14th, 2019 by Saurenergy Both India and Germany are in the process of outlining a Comprehensive Climate Change Act, laying down targets of emission reduction for all relevant sectors of the Indian economy. India and Germany have agreed to collaborate on a fund that will provide financial support to climate conservation projects aimed at reducing greenhouse gas emissions, promoting renewable energies and sustainable forest management in […] Read more