175 MW Solar Project Commissioned by Mahindra Susten in Bikaner Updated On Tue, May 24th, 2022 by Saurenergy Adding to the installed capacity of Rajasthan, the state with highest solar irradiance in India, Mahindra Susten has commissioned a portion of its solar project at Kolayat in Bikaner district. Mahindra has commenced the first portion of a 175 MW (AC) out of the total 250 MW solar project. Mahindra has been developing the solar […] Read more
Engineer- Controls II Updated On Tue, May 24th, 2022 by Saurenergy Requires to support global implementation and development of electrical controls systems/designs, PLC/HMI programing, perform vendor equipment check-out, equipment/system start-ups, data collection and optimization of control systems. Requires to support plant shift operations team by troubleshooting and problem solving on equipment controls issues to ensure they are resolved on timely and accurate manner. Essential Functions & Responsibilities:- […] Read more
Engineer- Facilities III Updated On Tue, May 24th, 2022 by Saurenergy Works as part of a team to ensure all facilities & systems under ELEC Department responsibility are properly installed, tested and commissioned successfully to meet high quality of international technical standards such as: NETA (National Electrical Testing Association), NFPA 70B, NFPA 70E (National Fire Protection Association) and IEEE during the construction phase. The Facilities Engineer (Electrical Supervisor) daily […] Read more
Power Electronics Specialist Updated On Tue, May 24th, 2022 by Saurenergy Engineering of Traction Converters and Auxiliary converters (Locomotive, EMU, Metro) Design Power schemes, System Stimulations & validation of power electronic converters / modules Cooling technologies (Air and Water Cooled) Calculation / simulation of losses and selection semiconductors Switching requirements, Driver card Qualification of the IGBT, power module design Thermal design of the 4QC, Inverter and […] Read more
Senior Component Engineer-HVDC (Electrical Engineering) Updated On Tue, May 24th, 2022 by Saurenergy Responsibility for analyzing and commenting on customer specification, writing clarifications and seeking amendments Responsibility for preparation of technical and commercial bidding documents for high voltage equipment. Technical support of sales and project management Technical responsibility of designing and standardization of High Voltage equipment for HVDC and Grid Access projects with regard to design to cost […] Read more
Tesla Nears Setting-up Electric Vehicle & Battery Factory in Indonesia Updated On Tue, May 24th, 2022 by Saurenergy Leading EV seller Tesla is close to inking a pact that will allow the US-based company to set up an electric vehicle factory in Indonesia. The facility may come up in Central Java’s Industrial complex and it may also host manufacturing of EV batteries. As per reports, the construction could start by the end of […] Read more
LML to enter EV segment; Plans 3 electric two-wheelers through Rs 350 cr investments Updated On Tue, May 24th, 2022 by Saurenergy Lohia Motors Ltd or what is popularly known as ‘LML’ has said that its planning to enter the electric vehicles segment by rolling out three electric two wheelers and will invest Rs 350 crore for the same, including a manufacturing facility. LML, or at least its old version, shut down in 2018, after a series […] Read more
Mahindra Will Seek Partnerships To Source EV Components Updated On Tue, May 24th, 2022 by Saurenergy Anish Shah, Chief Executive Officer of Mahindra and Mahindra, has said that the company has planned to source components from other players in order to give fillip to its electric vehicle portfolio. A week ago, Mahindra and Mahindra had announced its strategic collaboration with Volkswagen where the latter was to equip the EVs of the […] Read more
Greenko Will Supply Renewable Power to ArcelorMittal, Ayana, DISCOMS Updated On Tue, May 24th, 2022 by Saurenergy Hyderabad based Greenko Energies Pvt Ltd will be supplying clean power to ArcelorMittal, Ayana Renewable Power and three Indian states from its upcoming renewable energy plus storage facility worth 5,230 MW being constructed in Kurnool, Andhra Pradesh, according to reports. Just days ago, Greenko commenced the work on the integrated RE storage project in Kurnool […] Read more