EU Finalizes Net-Zero Industry Act, Boosts Green Technology Deployment Updated On Wed, Feb 7th, 2024 by Saurenergy The Council and the European Parliament recently reached a provisional deal on the regulation establishing a framework of measures for strengthening Europe’s net-zero technology products manufacturing ecosystem, better known as the ‘Net-Zero Industry Act’ (NZIA). Under the agreement, there will be a single list of net-zero technologies, with criteria for selecting strategic projects in those […] Read more
Senior Consultant – Sustainable Development & Healthy Living Updated On Tue, Feb 6th, 2024 by Saurenergy WSP is seeking a Senior Sustainability Consultant with more than 6 years of experience to join our large and growing Environmental and Sustainability team to work with our Middle East Advisory Services team. The successful applicant will operate within a team of environmental and sustainability professionals in Bangalore/Noida delivering the highest standards of technical work […] Read more
Associate – Energy Updated On Tue, Feb 6th, 2024 by Saurenergy We are looking for Lead or Energy tean in Bengaluru/ Noida location The candidate should have knowledge in both primary & secondary detailed engineering of EHV substations and subject matter expert at least one of them. Candidate expertise in detailed design of electrical substation facilities including Single Line Diagram, Protection Single Line diagram, General Arrangement layout, […] Read more
Senior Engineer-Structures (Energy) Updated On Mon, Feb 5th, 2024 by Saurenergy We are looking to recruit Masters’ degree qualified Structural Engineer to join our growing team in Noida/Bangalore Minimum 8 years of experience in the structural design works for building structures (concrete and steel). Hands on experience on all kinds of structural framing systems for gravity loads and lateral loads Hands on Experience on Dynamic analysis […] Read more
UK Releases New Measure To Support Faster Adoption Of Chargepoints Updated On Mon, Feb 5th, 2024 by Saurenergy The United Kingdom (UK) government recently released ‘Plan for Drivers’ a new measure to support electric vehicle drivers to make the switch towards electric vehicle. The new proposals are undertaken to ensure chargepoints can be installed even faster and it included grants for schools, cash for councils and new proposals to boost number of chargepoints. […] Read more
Waaree Renewables Technologies Wins Rs 547.5 Crore EPC Order Updated On Mon, Feb 5th, 2024 by Saurenergy Mumbai headquartered Waaree Renewable Technologies Limited (WAAREERTL) has secured a Letter of Award (LOA) as per which the company will be executing an Engineering, Procurement and Construction (EPC) work for a solar power project of 412 MWp /335 MWac. This will be executed on a turnkey basis. The EPC work order of Waaree for the […] Read more
DCS Lead Engineer Updated On Fri, Feb 2nd, 2024 by Saurenergy You will be responsible for complete Project Life Cycle i.e. starting from inputs analysis, Design & Engineering, Testing & Factory Acceptance Test (FAT) followed by commissioning as per requirement. Design and implementation of Boiler / BOP, Packages (e.g. Ash Handling, FGD, Water Treatment, etc.) Process simulation & testing, Understanding of SAMA, Narratives, and control schemes […] Read more
Finnish New WaveRoller Technology Contributes To EU RE Capacity Updated On Fri, Feb 2nd, 2024 by Saurenergy Finnish enterprise AW-Energy has recently successfully developed a wave farm project that converts ocean wave energy to electricity through WaveRoller technology. The machine operates in near-shore areas (approximately 0.3-2 km from the shore) at depths of between 8 and 20 meters. The commission mentions about the waveroller technology, “Depending on tidal conditions, it’s mostly or […] Read more
Lightsource bp Offloads 294-MW Italian Solar Projects Updated On Fri, Feb 2nd, 2024 by Saurenergy Lightsource bp have announced that it has inked an agreement for the sale of six solar greenfield projects in Italy to EOS Investment Management Group (EOS IM). Lightsource bp said that the portfolio is currently either permitted or in the late stages of development with construction expected to begin in the next 12 months. EOS […] Read more