SUBSCRIBE NEWS LETTER

ida

Model Validation Engineer

Primary Responsibilities:- Oversee grid model sets used for BESS system grid connections, providing troubleshooting and technical support as needed. Manage and provide essential model documentation, technical information, and project-specific documentation when required. Collaborate closely with design teams to develop key design elements affecting grid connections, such as voltage control strategies and plant performance curves. Offer […]

Read more

Validation Engineer – Tool Design

Responsibilities:- Responsible for understanding, clarifying and reviewing tooling design specification, design verification & validation, design risk associated in manufacturing value chain Responsible for validation of technical design documentation such 3D CAD, 2D drawings, technical construction file, HSE risks assessment, DFMEA, Design verification procedure/report etc., adherence to relevant legislations. Validate product and process risk in a […]

Read more

JinkoSolar Becomes The First PV Firm To Get SBTi Validated Net-Zero Targets

Global solar module manufacturer JinkoSolar has now become the first solar PV firm globally to get its net-zero targets validated with SBTi (Science Based Targets initiative). SBTi is a global body enabling businesses to set ambitious emissions reductions targets in line with the latest climate science.  Additionally, it is the second company in mainland China […]

Read more

First Floating Solar Project of Duke Energy Kicks Off in Florida

The first floating solar project in Florida by clean energy firm Duke Energy is now operational and producing  renewable energy.  The floating solar project of close to 1 MW boasts over 1,800 solar panels floating atop two acres of water surface on a cooling pond at the Duke Energy Hines Energy Complex located in Bartow. […]

Read more

Trina Solar Consolidates Australian Market Presence with 1 GW Solar MoU

Solar panel manufacturer Trina Solar has joined hands by way of a Memorandum of Understanding (MoU) Solar Juice, an Australian solar distributor. The MoU will pave the way or Solar Juice to procure 1 GW of Trina Solar Vertex modules across a span of three years. The China-based firm will further cement its position in […]

Read more

Engineer Validation

Prepare validation/qualification lifecycle deliverables such as Validation Plans, Requirements Specifications, Traceability Matrix, Summary Reports, Change Controls. Ensure that the equipments are manufactured and following CE complaint/CE marked directives Prepare, review and execute qualification/ validation protocols and associated reports while adhering to a regulatory requirement. Develops written procedures for operation and maintenance of equipment. Manages Validation […]

Read more

UPEIDA Issues RFS for Development of EV Public Charging Stations with Battery Swapping System

UP Expressways Industrial Development Authority (UPEIDA) invites bids for the development of public charging stations including Battery Swapping System (optional, based on demand survey) for EVs through PPP mode along various Expressways in the State of Uttar Pradesh. The tender fee to be submitted by the bidder is INR 5,900. The bidder must submit the […]

Read more

Govt Orders To Extend Dispute Avoidance Mechanism For All Power Projects

The Ministry of Power, in its latest notification, has notified changes in the norms for the Dispute Avoidance Mechanism. In its latest addendum to the norms, the ministry has ordered extending this service to other energy sectors beyond hydroelectric power plants. Earlier, this mechanism was confined to only hydropower projects.  On September 27, 2021, the ministry […]

Read more

NGEL Issues Tender Seeking Consultant for Validation of 50 MW Solar Project

NTPC Green Energy (NGEL), a wholly-owned subsidiary of India’s largest power utility NTPC, has issued a tender to appoint a consultant and hire a designated operational entity (DOE) for the validation and verification of a 50 MW solar project in Rajgarh, Rajasthan. This also entails the renewal of the project for an additional seven years […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll