NREA drafts tender for 20 MW solar project in Hurghada Updated On Tue, Aug 9th, 2016 by Saurenergy The New and Renewable Energy Authority (NREA) is in process to release a tender for a 20 MW solar power plant in Hurghada, Egypt. Recently, Japan International Cooperation Agency’s (JICA) was presented with a proposal to finance the project for Hurghada solar plant by NREA. The Ministry of Electricity stated that a soft loan of […] Read more
Researchers develops Tiny High-Performance Solar Cells That Turns Power Generation Sideways Updated On Mon, Aug 8th, 2016 by Saurenergy Engineers at the University of Wisconsin—Madison have developed high-performance, micro-scale solar cells that can harvest almost three times more electricity from incoming light as compared to existing technologies. According to the researchers the miniature solar panels could power myriad personal devices — wearable medical sensors, smartwatches, even autofocusing contact lenses. The new, small cells, described […] Read more
Dakshina Kannada District Administration To Go Solar Updated On Mon, Aug 8th, 2016 by Saurenergy The Dakshina Kannada district administration has committed to install rooftop solar plants atop various government buildings in the district. Recently at a meeting chaired by then Deputy Commissioner A.B. Ibrahim, the administration decided to employ the entire sanctioned capacity of 1,000 kW facility under the Union government’s Integrated Power Development Scheme (IPDS). Ibrahim at the […] Read more
Kalindi Kunj Metro Depot to get Solar Plant atop Elevated Stabling Shed Updated On Mon, Aug 8th, 2016 by Saurenergy Delhi Metro will be installing a 3-MWp solar power plant onto an elevated stabling line of Kalindi Kunj metro depot, which will the the first-ever such shed being built in the DMRC network. DMRC told PTI, “The work on the stabling shed will be completed in about six months and then the solar plant will […] Read more
Germany’s Federal Network Agency fifth solar auction allocates 130 MW to 25 projects Updated On Sat, Aug 6th, 2016 by Saurenergy Germany’s Federal Network Agency has allocated 130 megawatt to 25 successful bids in the 5th round of the country’s auction scheme for large-scale solar. The average bid amount was calculated at €0.723 ($0.799) per kWh, down from €0.741 in the previous auction in April. Bid amounts are lower on average compared to the previous tender, […] Read more
Residents of Patna have pledge their roof space to generate solar energy Updated On Sat, Aug 6th, 2016 by Saurenergy Notable intellectuals and locals of Patna have pledge to volunteer for their roof space to generate solar energy. The initiative was carried out by Centre for Environment and Energy Development (CEED), making an attempt to urge the government to come up with a programme to convert “each house into a power house.” CEED has been […] Read more
XRMC completes a 7.27 MW solar rooftop project in Xi’an Updated On Fri, Aug 5th, 2016 by Saurenergy XRMC, which is a subsidiary of the state-owned China Communication Construction Co. Ltd. (CCCC) has announced the connection of a 7.27 MW rooftop solar PV plant to the grid in the city of Xi’an, the capital of Shaanxi Province in central China. Xi’an Road Construction Machinery Co. Ltd’s rooftop project marks the parent company’s first […] Read more
India’s 12 major ports to build 83 MW solar photovoltaic power plant Updated On Fri, Aug 5th, 2016 by Saurenergy Twelve major ports of India plan to commission 83-MW solar photovoltaic power plant projects from their own resources. Minister of State for Shipping Pon Radhakrishnan said, “The Government proposes to implement utility-scale solar photovoltaic power plant projects at various major ports across the country. The funds for establishment of solar power projects are arranged by […] Read more
ReNew Power acquires 5-MW Solar Plant PPA for Chandigarh International Airport Updated On Thu, Aug 4th, 2016 by Saurenergy ReNew Power Ventures Private Limited, one of the India’s top renewable energy company has acquired a PPA for 5-MW solar plant installation from Chandigarh International Airport (CHIAL). The solar project is said to use Single Axis Tracker Technology for improved efficiency. The agreement duration for the 5-MW project is 25 years and was earlier in […] Read more