CEL Issues Tender For 315 kW Solar Power Plant in Uttar Pradesh Updated On Wed, Mar 13th, 2019 by Saurenergy The last date of bid submission is March 22, 2019. The Central Electronics Limited (CEL) has issued a tender inviting online bids from eligible parties for the deployment of 315 kWp grid-connected solar PV power plant at its campus in Sahibabad, Uttar Pradesh. The brief scope of work for selected bidder(s) will include the design, […] Read more
Prez Sanctions Rs 11,814 Cr for Grid Connected Rooftop Solar Programme Phase-II Updated On Tue, Mar 12th, 2019 by Saurenergy However, the Ministry further added that the detailed operational guidelines for implementation of the scheme will be issued separately. The President of India has accorded for phase-II of grid-connected rooftop solar programme for achieving a cumulative capacity of 40 GW from Rooftop Solar (RTS) projects by 2022 with the total central financial support of Rs 11,814 […] Read more
Ingeteam Supplies Storage Power Station for Dubai’s Largest Solar Park Updated On Tue, Mar 12th, 2019 by Saurenergy Moreover, Japanese firm NGK Insulators Ltd has supplied its NAS batteries for the project. Ingeteam, a leading company specialising in the design of power and control electronics, has supplied its storage power station for a pilot battery energy storage system (BESS) project in Dubai’s largest solar park. The company said in a statement that, “Ingeteam […] Read more
5 Big Hurdles that have Emerged for India’s Solar Power Producers Updated On Mon, Mar 11th, 2019 by Saurenergy After installations of almost 10 GW and above in 2017 and close to 8 GW in 2018, the solar sector is facing its biggest challenge yet, as hurdles have emerged for the continued growth of the sector. Some of these challenges were always there, they are only bigger now, while others have emerged with time. […] Read more
The Solar Sector Needs More Women. Here’s Why Updated On Fri, Mar 8th, 2019 by Saurenergy As Rooftop Solar, Distributed solar and even corporate buying markets develop, its time for the renewable power sector to fix its gender imbalance. On International women’s day, its a good time to put the spotlight on the missing women in the solar power and broader renewable power sector. Among the brightest spots for the Modi […] Read more
SunSource Energy to Set Up 70 MW Solar Plant in UP Updated On Thu, Mar 7th, 2019 by Saurenergy The project, once commissioned, will be one of the largest open access solar power projects in Uttar Pradesh. SunSource Energy on Wednesday said it will develop a 70 MW solar power project under the open access scheme in Uttar Pradesh. The power generated by the project will be sold to commercial and industrial customers through long-term Power Purchase […] Read more
Solar Tender For 60 MW Rooftop Projects Issued by REMCL Updated On Thu, Mar 7th, 2019 by Saurenergy The last date of bid submission is April 30, 2019. The Railway Energy Management Company Limited (REMCL), a joint venture of the Indian Railways and RITES Limited, has invited bids to set up total capacity of 60.17 MW of rooftop solar PV power projects on the rooftops of offices, buildings, and railway establishments across the zonal […] Read more
AAI Opens Tender For Engineering Consultancy For 6 MW Solar Plant at Kadapa Airport Updated On Thu, Mar 7th, 2019 by Saurenergy The last date of bid submission is March 20, 2019, and the bids will open on the same date. The Airport Authority of India (AAI) has issued a tender seeking engineering consultancy for the work of revision of 6 MW solar PV power plant at the Kadapa Airport in Chennai. The scope of work from […] Read more
NTPC Invites Bids for 60 KW Rooftop Solar System at Farakka Plant Updated On Thu, Mar 7th, 2019 by Saurenergy The last date of bid submission is March 18, 2019, and the technical bids will open on March 19, 2019. The National Thermal Power Corporation (NTPC) has issued a tender inviting bids for setting up of 60 kWp (6 x 10 kW) rooftop solar systems at NTPC Farakka. The brief scope of work for the […] Read more