China’s Ambitious Solar Power Space Project is a bet on the future Updated On Wed, Mar 20th, 2019 by Saurenergy China plans to have a solar power station orbiting the earth at 36,000 km, allowing it to tap the energy of the sun’s rays without interference from the atmosphere or loss of sunlight. According to Chinese media, the country is working on plans to build a solar farm in space. The project is hugely ambitious […] Read more
Atlas Renewable Energy Secures $152 Mn For Financing of 3 Solar Plants in Brazil Updated On Wed, Mar 20th, 2019 by Saurenergy The three projects are estimated to benefit around 470,000 families per year with clean, renewable energy and will avoid the emission of 108,000 tons of CO2 annually. Atlas Renewable Energy, a leader in clean energy in Latin America, announced the completion of long-term financing of three of its solar energy plants in Brazil for a total amount […] Read more
ADB Commits $50 Mn in Noida-Based Solar Power Developer Avaada Updated On Wed, Mar 20th, 2019 by Saurenergy The multi-lateral funding agency said the investment contributes to ADB’s goal to provide cumulative climate finance of $80 billion from 2019 to 2030. The Manila based Asian Development Bank (ADB) announced that it has inked an agreement to invest $50 million in solar energy project developer Avaada Energy Pvt Ltd to help the company scale up rapidly. The investment will […] Read more
NHPC Issues Tender For 1082 kW Solar Projects in Himachal Pradesh Updated On Wed, Mar 20th, 2019 by Saurenergy The last date for bid submission is (April 12, 2019 – Online) April 15, 2019. NHPC Ltd. has issued a tender for the implementation of rooftop and small solar power plants of a total capacity of 1082.16 kW in NHPC power stations at Chamera-I (155 kW), Chamera-II (230 kW), Parbati-II (500 kW and 125 kW), […] Read more
EXIM Bank Extends 3 LOCs Worth $83.11 Mn to Congo For 3 Solar Projects Updated On Tue, Mar 19th, 2019 by Saurenergy The loan will be utilised for financing three solar photovoltaic power projects with a total capacity of 35 MW in the three provinces — Karawa, Mbandaka and Lusambo. The Export-Import Bank of India (Exim Bank0 has, on behalf of the Government of India, extended 3 Lines of Credit (LOC) aggregating USD 83.11 million to the […] Read more
Telangana Municipal Corporation: No Solar Panels, No New House Permit Updated On Tue, Mar 19th, 2019 by Saurenergy In the sort of decisiveness the industry could do within other states, in Telangana, the Municipal Body has made housing permits subject to solar installations. Telangana town municipality in Karimnagar is pulling out all stops to push for Renewable energy in its grid and at the same time finding customers for it. The Municipal Corporation […] Read more
MERC Approves Grid Connectivity For Isolated 1.36 MW Rooftop Solar Plant Updated On Tue, Mar 19th, 2019 by Saurenergy Based on its findings the Commission plans to amend existing regulations/frame new regulations for net metering. The Maharashtra Electricity Regulatory Commission (MERC) has approved the grid-connectivity requests for a 1.36 MW rooftop solar PV power project by the Supreme Industries Limited. The company had filed a petition regarding the forceful isolation of its 1.36 MW […] Read more
Hanergy’s Innovative Thin-Film Solar Products Bag Multiple iF Design Awards Updated On Tue, Mar 19th, 2019 by Saurenergy Hanergy Thin-Film Power Group, one of the world’s largest thin-film solar power solution company, recently bagged the prestigious iF Design Awards 2019, for four of its cutting-edge products. The company’s winning products include one Gold Award for its Single-Glass Triple-Arch HanTile, and an additional three three design awards for its Single-Glass Spool HanTile, Fold Backpack […] Read more
MEDA Floats Tender For Rooftop Solar with Battery Backup Updated On Tue, Mar 19th, 2019 by Saurenergy The last date of bid submission is March 23, 2019. The Maharashtra Energy Development Agency (MEDA) has issued a second tender inviting bids for setting up of total 10 kW of grid-connected rooftop solar PV power plant with battery back up under rooftop net metering at five Anganwadi of Buldhana district in the state. The […] Read more