Insolation Energy To Setup Its Solar Cell, Module Unit In MP Updated On Mon, Dec 16th, 2024 by Saurenergy The Board of Directors of Insolation Energy (INA Solar) has now approved the plan to commission its new solar cell, module and Aluminium frame manufacturing facility in Madhya Pradesh. The latest development marks its first investment in solar manufacturing outside Rajasthan. This comes after the Madhya Pradesh government offered land to the company in the […] Read more
Meghalaya Govt Unveils Policy To Boost Solar, Wind Energy Capacity Updated On Mon, Dec 16th, 2024 by Saurenergy The Meghalaya government recently released its policy to execute and expand solar power generation in the state, aiming to increase its solar power capacity from the current 4.28 MW (Till Nov. 2024). The latest policy released by the state allows short-term power purchases on behalf of the State Distribution Utility, entering into Power Purchase Agreements […] Read more
Indus Towers, JSW Arm Invest Rs. 38.03 Cr For 130 MW Solar Project Updated On Fri, Dec 13th, 2024 by Saurenergy Indus Tower, a Haryana-based telecom tower company today entered into a power purchase agreement (PPA) with JSW Green Energy Eight Limited, a special purpose vehicle (SPV). Under this agreement, Indus Tower would receive 130 MW of renewable energy from a solar power plant under captive mode. The company also agreed to make approximately Rs 38.03 […] Read more
Thinner, Taller Solar Modules Prone To Breakages: NREL Report Updated On Fri, Dec 13th, 2024 by Saurenergy Glass breakage has always been a concern, but until recently, the cause has been obvious. Several changes have caused an increased risk of glass breakage changes to solar PV module design and materials. A recent study by NREL showed that some glass always break into small pieces, in a pattern that shows a clear starting […] Read more
Assistant Manager – PMO ( Solar Manufacturing Projects) Updated On Thu, Dec 12th, 2024 by Saurenergy Support area infrastructure planning efforts at various stages, facilitate development of cost estimates and budgets, and establish reasonable cost and schedule baselines. Scheduling / Planning: Developing L-1 to L-2 schedule, S-curve and extrapolating it to L-4 to L-5 breakdown. Creating WBS for L4-L-5 level by identify the critical chain of the task. Monitoring/identifying the resource […] Read more
EPC Head – Project Execution (Solar industry) Updated On Thu, Dec 12th, 2024 by Saurenergy Responsibilities:- Project Planning and Execution: Ensuring effective planning, scheduling, and execution of engineering, procurement, and construction activities to meet project objectives within the specified timeline and budget. Team Management: Leading and managing a multidisciplinary team of engineers, procurement specialists, construction professionals, and subcontractors to ensure seamless coordination and collaboration throughout the project lifecycle. Stakeholder Management: […] Read more
Project Director (Solar industry) Updated On Thu, Dec 12th, 2024 by Saurenergy Responsibilities:- We are looking for a Project Head position to execute/monitor construction projects and oversee their progress along the way in a timely and cost-effective manner. You will be responsible for tendering, estimation, budgeting, organization, implementation and scheduling of the projects. Monitoring and controlling project performance Lead the team and Deliver the project Report project […] Read more
Adani Green Subsidiary Commissions 250 MW Solar Project At Rajasthan Updated On Thu, Dec 12th, 2024 by Saurenergy Adani Green Energy Limited (AGEL), step-down subsidiary, Adani Green Energy Twenty Five Limited, recently commissioned its 250 MW solar power project. This project is located at Badi Sid, District in Jodhpur, Rajasthan. With the commissioning of this plant, AGEL’s total operational renewable generation capacity has increased to 11,434 MW. Earlier this year, the company commissioned […] Read more
Rooftop Solar: 81,188 Govt Buildings Potent To Generate 3 GW Updated On Thu, Dec 12th, 2024 by Saurenergy The latest data from the Ministry of New and Renewable Energy (MNRE) said that the installation of rooftop solar on identified government buildings could harness up to 3.1 GW of solar energy. Minister of State (MoS) of MNRE Sripad Yesso Naik said that the ministry has identified 81,188 such feasible government buildings where rooftop solar […] Read more