Viz-A-Viz with Neelesh Garg, Director | Saatvik Green Energy Updated On Thu, Feb 21st, 2019 by Saurenergy Sustainability of the Industry is in Question I feel its unhealthy competition, which is driving the entire industry into a black hole. It starts right from the developers, to goes down till the manufacturer of small components. Sustainability of the industry is in question, because if people start using sub-standard products to match the cost, […] Read more
MBJ Post Shipment and Post Installation Inspection Report Updated On Thu, Feb 21st, 2019 by Saurenergy In order to realize the module test on site at the highest technical level, MBJ and there worldwide partners need the right testing equipment. MBJ invented and consistently improved the Mobile PV Laboratory for the efficient on-site testing of solar modules, so that today it works on the technical level of conventional stationary laboratories. Test […] Read more
ReNew Power Secures Additional Debt Funding of $350 Mn From OPIC Updated On Thu, Feb 21st, 2019 by Saurenergy The IPP has secured a fresh debt financing of up to USD 350 million from the US Government’s development finance institution. ReNew Power, one of India’s largest renewable energy Independent Power Producer (IPP) in terms of total energy generation capacity, has secured a fresh debt financing of up to USD 350 million from the Overseas […] Read more
NTPC Invites Applications For Enlistment of Wind Energy Developers Updated On Thu, Feb 21st, 2019 by Saurenergy The last date for application submission is February 27, 2019. NTPC Ltd. has issued a Notice Inviting Applications (NIA), inviting bids from eligible bidders for the enlistment of Wind Energy Projects (WEP) anywhere in India of NTPC. The brief scope of work for enlisted wind energy developers will include, the design, engineering, micro-siting, manufacture, supply, […] Read more
The URGE for “Li” Vault Updated On Wed, Feb 20th, 2019 by Saurenergy Nowadays, power storage has become vital on the back of its rapid response even at the time of peak demand, as most of the power storage technologies began transmitting power back to the grid within milliseconds. Moreover, storage technologies not only help in bolstering the use of electric vehicles but also help in reducing carbon […] Read more
We Welcome The Govt Decision For 2nd Phase of RTS Scheme: Praveer Sinha Updated On Wed, Feb 20th, 2019 by Saurenergy Heavy front-ended investment of RTS has been the single biggest challenge holding back its deeper penetration, particularly in rural and semi-urban parts of the country, Sinha said. In a bid to achieve the ambitious targets of 40 GW cumulative capacity from Rooftop Solar (RTS) Projects by 2022, the government has provided its consent for the […] Read more
Viz-A-Viz with Ashish Khanna, President, Tata Power (Renewables) Updated On Tue, Feb 19th, 2019 by Saurenergy Our policymakers will have to create an effective regulatory framework for the development and installation of a widespread solar water pump network. It will be largely beneficial if our farmers are made aware of the many benefits that come along with the adoption of solar water pumps as well. Policymakers can also incentivize the use […] Read more
An EV Charging Station Every 25 KM in India planned Updated On Mon, Feb 18th, 2019 by Saurenergy The ministry has made amendments to the Model Building Bye-laws (MBBL) 2016 and Urban Regional Development Plans Formulation and Implementation (URDPFI) Guidelines 2014, making provisions for establishing EV charging infrastructure. The government has issued a set of guidelines to set up charging stations for electric vehicles across the country, outlining ways to build such fuelling […] Read more
Innovation, Cooperation, and More at SECI’s Pre-Bid Meet for 7.5GW Leh-Kargil Tender Updated On Mon, Feb 18th, 2019 by Saurenergy At the pre-bid meeting called by SECI for the massive 7.5GW Leh-Kargil tender, interested bidders and a whole lot of other curious people turned up to know more. Pre-bid meetings for large projects are usually a place to get the nitty-gritty sorted and out of the way. Or in some cases, obvious mistakes or conditions […] Read more