Head- Project Development Updated On Wed, Apr 3rd, 2024 by Saurenergy As a Head- Project Development, you would be reporting to the Director – Business and Project Development. This a senior role responsible for overseeing and managing the end-to-end development of wind, solar and hybrid projects. This position shall play a crucial role in driving the growth of the company’s renewable portfolio, identifying project opportunities, conducting feasibility studies, […] Read more
Sri Lanka Offers An Opportunity For India In Solar Updated On Thu, Mar 7th, 2024 by Saurenergy Sri Lanka, which joined the renewable energy bandwagon much later than many others, thanks to its extended civil war and the brush with bankruptcy till recently, is finally ready to move ahead on its targets. The island nation targets taking the share of renewable energy to 70% of its requirements, from a share of just […] Read more
Cleantech Solar Crosses 300 MW Mark in Maharashtra For C&I Segment Updated On Wed, Feb 14th, 2024 by Saurenergy Cleantech Solar, a leading provider of renewable energy solutions to corporations in India and Southeast Asia, has commissioned open access solar PV projects totaling 24 MWp at its solar park in Yavatmal district of Maharashtra. Power from these projects is being procured by leading corporates on a captive basis to meet energy needs for their […] Read more
Statkraft Begins 519 MW Brazilian Wind Farm; It’s Largest Outside Europe Updated On Thu, Feb 8th, 2024 by Saurenergy Statkraft has announced the inauguration of its largest wind farm outside Europe – the 519 MW Ventos de Santa Eugênia Wind Complex – that is now coming up in Bahia, Brazil. Also, it is among the first hybrid projects in Brazil once the planned solar farm of 163 MW is added to optimise energy production. […] Read more
With Twin Deals, Cubico Acquires 1600-MW Renewables’ Pipeline in Mexican Market Updated On Thu, Feb 1st, 2024 by Saurenergy Cubico Sustainable Investments has announced the completion of two transactions which it says significantly enhance the company’s renewable energy footprint and development portfolio in Mexico. Through the acquisition of Renantis Mexico and a strategic agreement with Sowitec Group, the development pipeline of Cubico in Mexico has now exceeded 1.6 GW. The company says that the […] Read more
Solalite Power & ACME Take Home Highest Capacity in NTPC 1500 MW Wind-Solar Tender Updated On Thu, Dec 28th, 2023 by Saurenergy NTPC Ltd. has recently finalized a highly competitive bidding process for wind-solar hybrid power procurement in Tranche-1 (ISTS), open for development anywhere in the country. The tender, boasting a capacity of 1,500 MW, culminated in a reverse auction held on December 27, 2023. The initial L1 tariff was set low at INR 3.35 per kilowatt-hour […] Read more
Engineer Senior Engineer Power System Study Updated On Fri, Dec 15th, 2023 by Saurenergy Responsibilities:- In depth knowledge of conducting simulations and analytical studies for transmission and Distribution, Planning, load and generation interconnection, integration of renewables. Able to prepare simulation study models and carry out power system studies including but not limited to: Grid compliance studies for Wind, Solar, BESS and Hybrid projects. Steady state and Dynamic power flow […] Read more
Rajasthan Biggest Beneficiary Of Renewable Energy Lending: Report Updated On Mon, Dec 11th, 2023 by Saurenergy A latest report by Climate Trends and the Centre for Financial Accountability (CFA) on the financing of coal and renewable projects claimed that Rajasthan remained the largest beneficiary of renewable energy lending in the country. The study assessed 68 project finance loans across 11 coal and renewable energy projects in India that reached financial closure […] Read more
THDCIL Solicits Bids for 11 MW Floating Solar Plant Updated On Mon, Nov 20th, 2023 by Saurenergy Miniratna PSU THDC has floated a tender for setting up of grid connected 11 MW (AC) floating solar PV (FSPV) plant on raw water reservoir of Khurja Super Thermal Power Plant. The cost of the tender is pegged at INR 63.56 Crore (including GST). The last date and time of bid is November 20, 2023 […] Read more