India’s Top 5 Module Manufacturers By Highest Module Efficiencies Basis ALMM List Updated On Fri, Sep 1st, 2023 by Saurenergy The Ministry of New & Renewable Energy has updated the Approved List of Models and Manufacturers (ALMM). The validity stands from March 10, 2023 to March 10, 2027. The ALMM list lays down the approved manufacturers whose modules can be used for government supported projects in India. Currently, there is a temporary exemption till March […] Read more
4GW Rooftop Solar Capacity In India Likely By 2024 End: IEEFA Report Updated On Fri, Sep 1st, 2023 by Saurenergy A latest report by the Institute for Energy Economics and Financial Analysis (IEEFA) and JMK Research & Analytics claimed that India’s rooftop solar market is likely to add a record 4 Gigawatt (GW) of capacity in the fiscal year of 2024. The report claimed that the sector is on its way to overcoming several major roadblocks. […] Read more
Solar Feeders Promise To Fulfil Solar Targets in Agriculture Updated On Fri, Sep 1st, 2023 by Saurenergy Radheshyam Singh is a marginal farmer from Noorsarai in the Nalanda district of Bihar. While a few farmers from the district have availed the benefits of off-grid solar pumps for irrigation in the past, Radheshyam and most of the farmers in the neighbourhood still depend on the grid. However, dependency on the grid for irrigation […] Read more
KPI Green Energy Bags 9.70 MW Solar Projects Updated On Wed, Aug 30th, 2023 by Saurenergy Independent Power Producer KPI Green Energy has bagged domestic solar power projects with an aggregate capacity of 9.70 MW. Of this capacity, 4.70 MW capacity will be executed by KPI Green Energy Limited and 5 MW capacity by Sun Drops Energia Private Limited, a wholly owned subsidiary of the firm, under ‘Captive Power Producer (CPP)’ […] Read more
Suzlon Sees Wind Project Order Downsized From 285 MW To 168 MW Updated On Wed, Aug 30th, 2023 by Saurenergy Renewable energy solutions provider Suzlon Energy has announced that it has suffered a significant downsizing of an order it had won in 2018. The order, dated May 30, 2018, from Avikiran Solar India Private Limited was for a 285 MW wind project, which has now been downsized by the firm to just 168 MW. We […] Read more
Australia’s Sunrise CSP & Engineers India Ltd Join Hands for Solar Thermal Projects Updated On Tue, Aug 29th, 2023 by Saurenergy Australia-based Sunrise CSP (Concentrated Solar Power), a firm that designs, builds and operates industrial process heat and electricity generation plants that use concentrated solar thermal energy and India’s Engineers India Ltd (EIL) have entered into an MoU for Concentrated Solar Thermal (CST) projects in the oil and gas sector in India. This will also encompass […] Read more
NLC India Moving Towards Hybrid RE Projects: Prasanna Kumar, CMD Updated On Tue, Aug 29th, 2023 by Saurenergy Saur: What are the significant works NLCIL undertook in the past few years to boost its renewable portfolio? CMD: NLC India Limited (NLCIL) was an early bird central PSU to venture into the renewable sector. Our first renewable energy project was awarded in 2013 with a 51 MW wind power project. Later, we shifted towards […] Read more
Reliance AGM Announcements- Carbon Fibre Manufacturing, Sodium-Ion Batteries, Wind Manufacturing Takes Shape Updated On Mon, Aug 28th, 2023 by Saurenergy In its much-awaited 46th Annual General Meeting (AGM) today, Reliance Industries Chairman Mukesh Ambani laid out a sprawling vision for the firm’s expansion into green energy. With the firm setting itself on a path to carbon zero by 2035, Ambani said, “We are accelerating our journey to become net carbon zero by 2035 through renewables and bio-energy. We are […] Read more
BHEL Invites Bids for Design in Development of 300 MW Floating Solar Power Project Updated On Mon, Aug 28th, 2023 by Saurenergy BHEL SBD Bangalore has issued a tender for the design, supply and assembly of floating system and associated aAnchoring and mooring for development of 300 MW AC capacity floating solar power project at Rengali Reservoir at Angul District in the state of Odisha. The last date for bid submission is September 4, 2023 at 2 […] Read more