Proposal Engineering Manager – Mechanical BOP Updated On Fri, Apr 12th, 2024 by Saurenergy Work closely with Sales team by providing technical proposal & relevant cost – for overall Project & Mechanical BOP scope Workout feasible & optimum solution to meet customer’s requirement & give cognitive inputs to use during sales pitch Contribute to competitiveness and profitability of Siemens projects and solutions by challenging requirements and related costs Scope […] Read more
SGEL, APDCL Sign Agreement To Develop RE Projects In Assam Updated On Tue, Apr 9th, 2024 by Saurenergy SJVN Green Energy Ltd (SGEL), a wholly owned subsidiary of the company SJVN Green Energy Limited (SGEL) signed a joint venture cum shareholders agreement with Assam Power Distribution Company Limited (APDCL). The agreement covers the development of renewable energy projects/parks within the APDCL / SGEL or SJVN command area. This project is to be undertaken […] Read more
FIMER’s Made In India Inverters Shine In Key Indian PV Projects: KN Sreevatsa, MD Updated On Tue, Apr 9th, 2024 by Saurenergy 1.How was the year 2023 for FIMER in India In 2023, FIMER achieved a groundbreaking feat by securing its first major order of the year — a substantial 2.45 GW contract from a single client at a specific location in India. This was particularly significant as it involved the successful conclusion of the NTPC Phase […] Read more
GERC Imposes Additional Surcharge Of Rs 1/Kwh For Open Access Consumers Updated On Tue, Apr 9th, 2024 by Saurenergy The Gujarat Electricity Regulatory Commission (GERC) in its latest notification proposed imposing an additional surcharge for open access consumers in the state. The state electricity regulatory body proposed imposing an additional surcharge at the rate of Re 1 per Kwh. The GERC order said that the additional surcharge for these consumers would be applicable between […] Read more
As Govt Reimposes ALMM, New Challenges Emerge For Solar Industry Updated On Mon, Apr 8th, 2024 by Saurenergy Approved List of Module Manufacturers (ALMM) reimposition in India by the Ministry of New and Renewable Energy (MNRE) has led to speculations in the solar industry ranging from solar module manufacturers, and developers to other stakeholders. The ministry had earlier kept it in abysence for a few years to allow the domestic solar market to […] Read more
Sr.R&D Engineer-Power Transformer Electrical Design Updated On Thu, Apr 4th, 2024 by Saurenergy Responsibilities:- The successful candidate will be part of an R&D Team specialized in the Technology development of Power Transformers. Drives for product cost-out activities through appropriate design actions on Transformers. Possessing knowledge of Indian and International Standards & Codes – IEC, IEEE, BIS, DIN, ISO for electrical design-related aspects of power transformers and shunt reactors. […] Read more
Electrical Design engineer – Traction Transformers Updated On Thu, Apr 4th, 2024 by Saurenergy Roles and Responsibilities:- The success candidate will be the part of an International Design and Engineering Team heavily specialized in Traction transformer design covering different countries. Responsible for development of transformer designs in coordination with global Hitachi ABB factory based on the purchase order requirement, ordering specification in different areas of transformer Electrical design Coordinating […] Read more
Alpex Solar To Set Up Second Panel Manufacturing Facility In Mathura Updated On Thu, Apr 4th, 2024 by Saurenergy Noida-based Alpex Solar will be setting up its second solar panel manufacturing facility in Mathura, Uttar Pradesh. The company said it has got the approval from Uttar Pradesh State Industrial Development Authority (UPSIDA) to secure 7 acres of land in Mathura for which the payment will be done soon. According to Alpex Solar, the firm […] Read more
NTPC- REL Seeks Bids For 110 MW Wind Energy Project At Khavda Updated On Wed, Apr 3rd, 2024 by Saurenergy NTPC Renewable Energy Limited (NTPC REL), a wholly owned subsidiary of the NTPC Limited invited online bids from eligible bidders to supply and install wind turbines generators for ISTS-connected wind energy project with nominal capacity of 110 MW at Khavda RE Park. The document has single stage two envelope (i.e., Envelope-I: Techno-Commercial Bid and Envelope-II: […] Read more