SUBSCRIBE NEWS LETTER

gujarat

HVAC Engineer – Engineering

RESPONSIBILITIES:- Preparation and assisting the Senior Mechanical Design Engineer in the mechanical design calculations, drawings, specifications, and tender documents for the design projects Participation in design progress and design coordination meetings Previous HVAC engineering experience and a subject matter expert in the discipline of HVAC engineering discipline are required Up-to-date relevant knowledge of the HVAC […]

Read more

Adani Solar Signs MoU With Almiya Group, To SetUp 225 MW Solar Farm In Kerala

Adani Solar, the solar PV manufacturing arm of the Adani Group has announced that it has signed a Memorandum of Understanding (MoU) with the Kochi-based Almiya Group. The company is a well-known solar distributor, to solidify its presence in the region. Adani Solar also laid out the plan to build a 225 MW solar power […]

Read more

Avaada, Apraava, ReNew & JSW Bag NTPC’s 1.5 GW Solar Contract

Indian power behemoth NTPC recently awarded the contracts to four developers to setup its 1,500 MW of solar project. The Indian Renewable Energy Implementing Agency recently announced the results of its tender, floated earlier. The tender was meant for Inter-State Transmission System (ISTS) through these new proposed solar projects. Based on the reverse competitive bidding, […]

Read more

Pahal Solar Introduces 570W TOPCon DCR Modules

Gujarat-based solar module manufacturer Pahal Solar has now introduced its 570-watt TOPCon solar modules. The company said that these modules comply with the Ministry of New and Renewable Energy (MNRE’s) Domestic Content Requirement (DCR). It also said that they have been specially launched to cater to the rising demand for high efficient solar modules for […]

Read more

GERC Proposes Fixing Timelines For Rooftop Solar Connections

The Gujarat Electricity Regulatory Commission (GERC) has now proposed amending its existing rooftop solar and net-metering rules of 2016 to pave the way for fixing timelines for rooftop solar installations.  The new draft rules proposed that the technical feasibility report (TFR) should be submitted by the discoms within 15 days. This new provision was made […]

Read more

Solex Ties Up With GMEE, Wuxi Tidewinner To Expand Capacity By 800MW

Solex Energy Limited today announced signing of a Memorandum of Understanding (MoU) with GMEE Solar and Wuxi Tidewinner Industrial International Co., Ltd. This partnership will facilitate an 800 MW capacity expansion, enhancing Solex Energy’s existing 700 MW production capability to 1.5 GW by the end of the second quarter of FY 24-25. A release from […]

Read more

PGVCL Allocates 479 MW Capacity Solar Projects Under PM KUSUM-C

Paschim Gujarat Vij Company Ltd has allocated 479 MW solar projects to several developers under component C of the PM Kusum programme. The awarded projects are expected to be operational by the end of December 2024. The highest capacity was allocated to Onix Renewable followed by Indian Infrastructure and Project India. The tariffs that were […]

Read more

Open Access Charges: When Solar Fails To Deliver Promised Savings

The concept of open access in the electricity market was introduced to foster competition and provide consumers with the freedom to choose their electricity suppliers. However, despite the potential for savings, the reality is that net landed solar electricity often does not result in significant cost reductions for end consumers. This outcome is largely due […]

Read more

Avaada Group Commissions 50 MW Solar Plant In Bihar

Avaada Energy , the renewable energy arm of Avaada Group, commenced a new 50 MW solar power plant in the Banka district on Tuesday. With this Bihar has now increased its total solar capacity to 181.1 MW. Last year approval was given for a 75 MW solar plant in Banka and a 125 MW solar […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll