GESCL Floats 35 MW/57 MWh Solar+Storage EPC Tender Updated On Wed, Sep 8th, 2021 by Saurenergy The Gujarat State Corporation Limited (GESCL) has issued a Request for Proposal (RfP) to appoint contractors for the design, engineering, installation, construction, commissioning & operation and maintenance of a 35 MW (AC) solar PV grid-connected power plant along with a minimum 57 MWH battery energy storage system, with 12 years O&M, at its Kutch Lignite Thermal Power […] Read more
6 States to Lead Growth in Indian Renewable Open Access Space: Study Updated On Tue, Sep 7th, 2021 by Saurenergy The bulk of the new capacity addition of renewable Open Access projects would likely be centred in Gujarat, Maharashtra, Uttar Pradesh, Rajasthan, Karnataka and Chhattisgarh in the near term, finds a new report. Tata Cleantech Capital Ltd (TCCL), a joint venture between Tata Capital Limited and International Finance Corporation, Washington D.C. (World Bank Group) has […] Read more
IREDA Releases List of Tentative Bidders for 5 GW CPSU Scheme Updated On Mon, Sep 6th, 2021 by Saurenergy The Indian Renewable Energy Development Agency Ltd. (IREDA), the agency appointed by Ministry of New & Renewable Energy (MNRE) for the implementation of the CPSU Scheme Phase II, has released a tentative list of bidders for building 5000 MW capacity of renewable energy. Under the Central Public Sector Undertaking (CPSU) scheme phase-II, 12,000 MW grid-connected […] Read more
Project Control Analyst Updated On Sat, Sep 4th, 2021 by Saurenergy Support the Value Chain CFO and the Engineering Executive to follow the Engineering Operational performance, especially in 2 main aspects, Project Monthly Reviews and Functional costs (Variable, RTS, R&D). Responsibilities:- Associated to another Engineering Analyst, she/he will have the responsibility to monitor the main Financial KPIs of Engineering. During Project Monthly Reviews, she/he will prepare […] Read more
UK to Pump $1.2 B into Green Projects in India: 11th Eco & Fin Dialogue Updated On Fri, Sep 3rd, 2021 by Saurenergy At the 11th India-UK Economic and Financial Dialogue (EFD) held yesterday, Finance Minister Nirmala Sitharaman and UK Chancellor Rishi Sunak signed off a $1.2 billion package of public and private investment in green projects and renewable energy to boost India’s green growth ambitions. The dialogue saw the announcement of new steps to tackle climate change […] Read more
HOP Electric Mobility Starts Setting Up 2nd Unit in Jaipur Updated On Thu, Sep 2nd, 2021 by Saurenergy Jaipur-based two-wheeler maker HOP Electric Mobility is planning to expand its presence in multiple states, including Rajasthan, Punjab, Haryana, Uttar Pradesh, Gujarat, Telangana, Madhya Pradesh, Bihar and West Bengal. The company is setting up its second manufacturing facility in Jaipur to add capacity of 1.5 lacs units per year by February 2022. The company already has […] Read more
Goldi Solar Unveils HELOCò™ Pro Module Series with M10 Technology Updated On Tue, Aug 31st, 2021 by Saurenergy Solar PV manufacturer Goldi Solar has launched its new product line – the HELOCò Pro module series — which features mono-facial and bi-facial modules with M10 wafer size. With an area up to 2.58 square meter, weight of 32kg and power of 560W, the new modules can be widely used in utility, agriculture, industrial, and […] Read more
Engineer – Electrical Updated On Thu, Aug 26th, 2021 by Saurenergy Responsibilities:- Electrical Design Validation. Electrical Installation Supervision and Validation on site. Ensure Electrical compliance with customer specification. Factory Acceptance Test of Electrical Panels and Supervision. Documentation – Electrical and Instrumentations. Supplier Co-ordination. Tasks:- Electrical Panel Design & Layout, Engineering with EPLAN P8. Prepare Instrumentations & Hookup Drawings. Design Control System, Configure Industrial Network Architecture. Wiring […] Read more
Lead TSCM Updated On Wed, Aug 25th, 2021 by Saurenergy Direct and establish a proactive and effective cover against electronic surveillance to promoters by regular risk assessment using TSCM equipment. Leverage technology to ensure information and data safety and provide a secure communication channel. Responsible for efficient operations of EPT control room. Responsibilities:- Management and Review:- Monitor team operations and ensure adherence to established SOPs. […] Read more