NTPC Floats Tender for 150 kW Rooftop Solar Plant at its Farakka Township Updated On Wed, Jul 24th, 2019 by Saurenergy NTPC has issued a tender for setting up of 150 kW rooftop solar PV plant in the hospital building at NTPC Farakka NTPC Ltd. has issued a tender, inviting bids from eligible bidders for setting up of 150 kW rooftop solar PV plant in the hospital building of Field Hostel Township at NTPC Farakka in […] Read more
Adani Issues RfS for 350 MW Hybrid Wind-Solar Projects Updated On Tue, Jul 23rd, 2019 by Saurenergy Adani Electricity Mumbai Ltd has issued an RfS for setting up of 350 MW wind-solar hybrid power projects with greenshoe option for additional 350 MW capacity Adani Electricity Mumbai Limited (AEML), a wholly-owned subsidiary of Adani Transmission Ltd, has issued a Request for Selection (RfS) for selection of developers for setting up of 350 MW grid-connected […] Read more
REIL Floats Tender for Solar Power Plants in Maharashtra Updated On Tue, Jul 23rd, 2019 by Saurenergy REIL has tendered for solar plants with capacities ranging from 250 kW to 2 MW or more at various locations in Maharashtra Rajasthan Electronics & Instruments Limited (REIL), a central public sector enterprise, has issued a tender, inviting bids from interested parties for the installation of solar PV power plants with capacities ranging from 250 […] Read more
MNRE Issues Guidelines for Implementation of KUSUM Scheme Updated On Tue, Jul 23rd, 2019 by Saurenergy MNRE has issued guidelines for the implementation of the Rs 34,422 crore KUSUM Scheme The Ministry of New and Renewable Energy (MNRE) has issued guidelines for the implementation of the Rs 34,422 crore Pradhan Mantri Kisan Urja Suraksha evam Uthan Mahabhiyan (KUSUM) Scheme, that aims to provide both financial security and more sustainable water access […] Read more
NTPC Issues IFB for 20 MW Solar Plant at Rihand Updated On Mon, Jul 22nd, 2019 by Saurenergy NTPC has issued an IFB for the development of a 20 MW solar project at Rihand NTPC Ltd. has issued an Invitation For Bids (IFB) for the development of a 20 MW solar PV project at NTPC-Rihand. The state-owned utility has invited bids from eligible bidders on a single stage two envelope basis with reverse […] Read more
Energy Horizons 2019: The Curtailment Issue Updated On Sat, Jul 20th, 2019 by Saurenergy On day 2 of Energy Horizons 2019, a session titled ‘Circumventing the Challenge of Grid Adoption” was actually a session about the challenge of curtailment of renewable power by Discoms. A topic so sensitive, that even calling it that is an issue, apparently. Thankfully, a healthy discussion did follow, although a solution was still elusive […] Read more
Report Projects India Will Exceed its Paris Agreement Target Updated On Sat, Jul 20th, 2019 by Saurenergy A new report has projected that India is likely to obtain 63% of its installed power capacity from non-fossil fuel sources (including hydro) by 2029-30, and exceed its Paris Agreement target of 40%. A new report has projected that India is likely to obtain 63% of its installed power capacity from non-fossil fuel sources (including […] Read more
SECI Amends 2 GW Tender Under CPSU-II Scheme Updated On Fri, Jul 19th, 2019 by Saurenergy SECI has amended its RfS for setting up of 2 GW solar projects in India under the CPSU scheme phase-II for a second time. The Solar Energy Corporation of India (SECI) has amended its Request for Selection (RfS) for setting up of 2 GW grid-connected solar PV power projects in India (Tranche-I) under the CPSU […] Read more
Oil India Limited Issues EoI for 100 MW Solar Plant Updated On Fri, Jul 19th, 2019 by Saurenergy Oil India Limited has issued an EoI for development of a 100 MW solar power plant in any state under the CPSU scheme. Oil India Limited (OIL), a Navaratna enterprise, has issued an Expression of Interest (EoI) for development of a 100 MW grid-connected solar power plant in any state under the second phase of […] Read more