India Must Strengthen Grid Infra to Boost Renewable Energy: IRENA Updated On Thu, Mar 29th, 2018 by Saurenergy IRENA Director-General Adnan Z Amin says the main constraint in India right now is the grid. There is a huge upsurge in investment,” he said of the renewable projects being implemented in the country. India must strengthen grid infrastructure to support its “strong push” towards renewable energy especially solar, said the head of the International […] Read more
POSTPONEMENT OF THE TENDER UPLOADING : SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 100MW (50MW X 2) GRID CONNECTED FLO Updated On Mon, Mar 26th, 2018 by Saurenergy This has reference to the NIT No. SECI/C&P/SPD/RfS/100MW FLOATING/UP/032018 published dated 16.03.2018 regarding the RfS Selection of Solar Power Developers for Setting up of 100MW (50MW x 2) Grid Connected Floating Solar Power Projects to be installed at Rihand Dam (also known as Govind Ballabh Pant Sagar Reservoir), Sonbhadra District, Uttar Pradesh. The RfS documents […] Read more
MIPAQ Pro, the Intelligent Device for Smart Grids Updated On Wed, Mar 21st, 2018 by Saurenergy Installing the MIPAQ Pro at the heart of an inverter makes changing topology very easy. At the end of their production line, customers can choose between chopper- and half-bridge modes via Modbus. Infineon Technologies said it has ‘optimised its high power intelligent power module (IPM) MIPAQ Pro’ for energy storage and smart grid. The company […] Read more
Tata Power signs MoU with EDF for ‘Smart Grid Tech’ Updated On Thu, Mar 15th, 2018 by Saurenergy Tata Power and Électricité de France shall be jointly demonstrating to help de-carbonise local energy systems and evaluate ‘Smart Grid Technologies’ in India, using innovative solutions. Tata Power Delhi Distribution Limited (TPDDL) has joined hands with Électricité de France (EDF) and its wholly-owned subsidiary Enedis to explore prospective opportunities together, related to ‘Smart Grid Technology’ in […] Read more
IBC Solar Connects 3 Mw Solar Power to the Grid in India under Open Access Updated On Thu, Mar 15th, 2018 by Saurenergy The now inaugurated project is IBC solar’s first solar park under this provision. LNB Renewable Energy executed the complete project development, approvals and transmission line works whereas IBC solar performed the EPC. IBC Solar, German solar systems provider, has widened its business in India. Recently, the inauguration ceremony took place at the plant site in […] Read more
MNRE Continues Off-Grid & Decentralized CST Scheme Updated On Wed, Feb 28th, 2018 by Saurenergy The scheme will be implemented as per the operational guidelines. The Ministry of New and Renewable Energy (MNRE) has issued an order for the continuation of the scheme on ‘Off-Grid and Decentralized Concentrated Solar Thermal (CST) Technologies for community cooking, process heat and space heating & cooling applications in industrial, institutional and commercial establishments’ during […] Read more
Smart Grids Overcome Renewable Energy Variability and Uncertainty Updated On Mon, Feb 26th, 2018 by Saurenergy Smart grids—modernized networks that enable bidirectional flows of energy and use two-way communication and control capabilities, and “distributed generation”— will address the variability and uncertainty of RE without utilities having to add to their conventional Renewable Energy (RE, which includes hydro, biomass, and geothermal as well as the more familiar photovoltaic (PV) and wind) faces […] Read more
Alfen to Supply 140kW Energy Storage System to Belgian Grid Operator Updated On Tue, Feb 20th, 2018 by Saurenergy Alfen supplies a 140kW energy storage system that will be connected to Eandis’ logistical center. Alfen, specialist in energy solutions for the future has announced the start of a smart energy storage system for Eandis ‘logistical center in Lokeren, Belgium, that will be used to optimize self-consumption of the rooftop solar energy generation. The storage system, […] Read more
EXTENSION OF BID SUBMISSION DATE FOR 200 MW GRID CONNECTED SOLAR PV PROJECTS UNDER PHASE-II BATCH-4, TRANCHE-XIV AT PAVAGADA SOL Updated On Fri, Feb 16th, 2018 by Saurenergy EXTENSION OF BID SUBMISSION DATE FOR 200 MW GRID CONNECTED SOLAR PV PROJECTS UNDER PHASE-II BATCH-4, TRANCHE-XIV AT PAVAGADA SOLAR PARK KARNATAKA has been uploaded on TCIL Portal having TSC code – SECI-2018-TN00006 for the same. Read more