Pem Solar Updated On Thu, Dec 1st, 2022 by Saurenergy As a Project Engineering Manager, the person shall ensure that the engineering activities of the project takes place within stipulated time (w.r.t. both quality & cost). She / He shall ensure the adherence to L2 schedule during execution of the project. She / He shall work on optimizations / alternate proposals / solutions for quick […] Read more
Solar Ac Design Lead Updated On Thu, Dec 1st, 2022 by Saurenergy The person shall be responsible for the complete design and detailed engineering for Solar Power plants like Mini Grid and Mega watt scales plants ,roof top plants . The Design Lead shall manage and review the entire design documents and drawings for a project or a set of smaller projects including co-ordination with other […] Read more
Meta & D. E. Shaw Renewable Sign 200 MW Clean Power Project in Arkansas Updated On Thu, Dec 1st, 2022 by Saurenergy The signing of a long-term renewable energy offtake deal with Meta was recently announced by D. E. Shaw Renewable Investments (DESRI), a significant U.S. producer of renewable energy. To come up in Phillips County, Arkansas, the Long Lake Project (also known as Long Lake) will be a 200 MWac project. To meet the region’s expanding […] Read more
Application Engineer – Solar PV Updated On Thu, Dec 1st, 2022 by Saurenergy Responsibilities:- Review project inputs, drawings, and specifications; should be able to capture the scope and understand the complete requirements of the project. Review the geographical site location and understand the site details. Manage and organize meteorological data. Perform ‘Preliminary design’ in PVsyst for pre-sales activities. Perform ‘Project Design’ including thorough PV-system design and performance analysis. […] Read more
India’s Policy Framework For Low-Carbon Electricity Generation Updated On Thu, Dec 1st, 2022 by Saurenergy India recently submitted its Long-term Low-Carbon Development strategy to the requirements of the Paris Agreement. The South Asian country aims to go carbon-neutral by 2070, requiring adopting new technological developments while taking care of all the associated risks. For this, the Policy framework that the country adopts will matter the most in its transition to […] Read more
GEDA Floats Tender for Setting Up 40 Electric Vehicle Charging Stations Updated On Thu, Dec 1st, 2022 by Saurenergy The commissioning, operation, and maintenance of 40 electric vehicle (EV) charging stations at various places around Goa are being solicited by the Goa Energy Development Agency (GEDA). Through the Faster Adoption and Manufacturing of Hybrid and Electric Vehicles (FAME II) program, the charging stations will be installed on a design, build, operate, finance, and transfer […] Read more
DLL Floats Tender for Supply of Solar Inverters for Solar Plant, Port Blair Updated On Wed, Nov 30th, 2022 by Saurenergy Directorate of Lighthouses and Lightships has floated a tender for the supply of solar inverters for the solar power plant at North Point Light House Port Blair. The last date for submitting the online bid is December 15, 2022, till 03:00 pm. Bids will be opened on December 16, 2022, at 03:00 pm. This solar […] Read more
Senior Engineer Electrical Design Updated On Tue, Nov 29th, 2022 by Saurenergy Senior Engineer – Electrical Design is responsible for the design, verification & validation of the components for the solar inverter product, alternate supplier product validation, cost reduction of the components and reduction of the the overall product BOM cost. ACTIVITIES:- Hands on experience with component level design/engineering for solar inverter / any PE converter cubicles. […] Read more
WBSEDCL Floats Tender for 10 MW Ground-Mounted Solar Plant at Gangapur Updated On Tue, Nov 29th, 2022 by Saurenergy West Bengal State Electricity Distribution Company Limited (WBSEDCL) intends to develop two grid-connected & ground mounted solar PV power plants of 10 MW solar project (each) at Gangapur-I and Gangapur-II respectively under Rajnagar Block in Birbhum District of West Bengal. The last date for submitting the online bid is January 03, 2023, till 03:00 pm. […] Read more