KPI Green Energy Emerges Winner for 200 MW Project in GUVNL Tender Updated On Fri, Aug 4th, 2023 by Saurenergy KPI Energy has emerged as the winner in the Gujarat Urja Vikas Nigam Limited (GUVNL) tender for development of a solar photovoltaic power project. The firm had participated in the competitive bidding process for the “Purchase of power through competitive bidding process vide RFS No. GUVNL / 800 MW / Khavda / Solar (PhaseXX)” issued […] Read more
A Case For Green Financing For More Transmission Infrastructure Updated On Fri, Aug 4th, 2023 by Saurenergy In a provocative blog on the importance of the transmission sector and its role in the energy transition, two world bank staffers make the case for expanding the definition of green projects when it comes to transmission projects, to ensure faster adaption of these vital infrastructure to handle green energy projects. The article comes at […] Read more
12 States Now Host India’s 50 Solar Parks Updated On Fri, Aug 4th, 2023 by Saurenergy Recent data from Lok Sabha shared by the Union Minister of New and Renewable Minister RK Singh indicated that solar parks have made its entry to 12 Indian states. At the same time, it is still a non-starter in many other states. A written reply by the minister said that these 12 states now host […] Read more
GUVNL Tender: ReNew To Supply Solar Power At Rs 2.71/unit Updated On Fri, Aug 4th, 2023 by Saurenergy ReNew Solar Power is now all set to sell its solar power at the rate of Rs 2.71 per unit, discovered through competitive bidding by the Gujarat Urja Vikas Nigam Limited (GUVNL). The tender on the same was on February 4, 2023, for a 500 MW grid-connected solar project to be set up anywhere in […] Read more
PSPCL Invites Bids for Procurement of 500 MW Solar Projects Updated On Thu, Aug 3rd, 2023 by Saurenergy Punjab State Power Corporation Limited has invited bids for the procurement of 500 MW of power from grid-connected ground-mount or floating solar projects established in Punjab. The last date for online submission of bids is September 12, 2023. Bidding opens on September 14, 2023. The ceiling tariff for the tender is INR 2.75/Kwh. A bidder […] Read more
Govt Releases New Bidding Norms For Solar Projects Updated On Thu, Aug 3rd, 2023 by Saurenergy The Ministry of Power has released new guidelines for bidding of grid-connected solar projects in the country. This comes days after the ministry released a similar document on the bidding format for medium and large wind projects. The new bidding document aims to bring uniformity in solar bids, clearly defining timeline of the projects, Power […] Read more
Swiss Storage Firm Energy Vault Commissions First Gravity Energy Storage System In China Updated On Wed, Aug 2nd, 2023 by Saurenergy The world’s first grid-scale EVx™ gravity energy storage system (GESS) has entered the first phases of commissioning. Energy Vault Holdings, a firm that delves in sustainable, grid-scale energy storage solutions, has announced the commissioning of the project, along with its partners Atlas Renewable and China Tianying (CNTY). Located outside of Shanghai in Rudong, Jiangsu Province, […] Read more
SaurEnergy Explains- From Coal to Clean: Past, Present, & Future of India’s Renewable Energy Updated On Wed, Aug 2nd, 2023 by Saurenergy India has come a long way from its fossil fuel-based economy to becoming the nation with the fourth-largest installed capacity of renewable energy in the world. Coal and oil have so far served as the bedrock of India’s industrial growth and modernisation, giving a rising number of Indian people access to modern energy services. This […] Read more
NHPC To Provide Solar Power At Rs 2.73/unit From Khavda Updated On Wed, Aug 2nd, 2023 by Saurenergy NHPC Limited is all set to sell its solar power from its proposed 200 MW grid-connected solar project at Khavda in Gujarat. NHPC emerged as one of the four successful bidders for a 1200 MW solar project from the region through a tender floated by the Gujarat Urja Vikas Nigam Limited (GUVNL). The Gujarat Electricity […] Read more