Telangana Issues Tender For 1 GW Of Rooftop Solar Projects Updated On Tue, Nov 26th, 2024 by Saurenergy The Telangana State Renewable Energy Development Corporation Limited (TSREDCO) has now issued a tender for rooftop solar projects. Through this tender, the state has planned to add 1 GW of new rooftop solar capacity. The move comes as the state plays catch up on renewable capacity, considering the limited options to add large, utility scale […] Read more
Power System Senior Consultant Updated On Tue, Nov 26th, 2024 by Saurenergy The Power System Senior Consultant focusses on the design, development, and implementation of electrical power systems for a variety of applications. This position requires a strong understanding of electrical engineering principles, power system design methodologies, and proficiency in relevant software tools. Key Accountabilities:- Lead on excellence in power systems software packages (e.g. DIgSILENT PowerFactory, PSS/E, […] Read more
Technician- Engineering Maintenance Updated On Tue, Nov 26th, 2024 by Saurenergy Assist in the installation and qualification of manufacturing equipment. Troubleshoot day-to-day manufacturing process and equipment issues. Perform, as directed, all necessary maintenance and repair of the equipment in a timely and cost-efficient manner. Identify and/or implement system improvements that contribute to the achievement of throughput, yield and product performance goals. Participate in the training/upskilling of […] Read more
Deputy Manager – Module Quality (Customer Support) Updated On Tue, Nov 26th, 2024 by Saurenergy Responsibilities:- Receives customer’s complaints of solar module or from solar farms by telephone or mail, and provides information requested. Log the complaints post receiving of complete details. Analyses the complaints, discuss it with the concern team to resolve using 8D method and finally reply to the marketing dept. with the appropriate report. If require visit […] Read more
RE Evacuation From Khavda To Nagpur Set To See A Fillip Updated On Tue, Nov 26th, 2024 by Saurenergy The evacuation of renewable energy from Khavda Renewable Energy Park is set to get a fillip. Power Grid Corporation of India Ltd (POWERGRID) has awarded a contract to develop a high voltage direct current (HVDC) link. This link will aid in the transmission of green from Khavda to Nagpur. This is set to be used […] Read more
Operation Head- Solar Updated On Tue, Nov 26th, 2024 by Saurenergy Operational Excellence:- Achieve target performance metrics (PR, CUF, PA, GA) monthly, ensuring operational efficiency across all solar sites. Ensure timely closure of audits and maintain zero repetitive audit observations within the portfolio. Manage inventory effectively to avoid stock issues, ensuring materials are categorized using VED, FSN, and ABC methods. Implement technology initiatives such as BAX […] Read more
Supply Chain A Major Hinderance To APAC’s Wind Projects: GWEC Updated On Mon, Nov 25th, 2024 by Saurenergy Offshore wind is grappling with supply chain challenges, particularly in accessing onshore wind nacelles. A GWEC report found that China is the dominant supplier in the Asian Pacific (APAC) region. According to Global Wind Energy (GWEC), China holds an 85% Onshore market share, India and South Korea’s nacelle capacity is focused solely on onshore projects, […] Read more
News In Brief Nov 25: Sungrow Partners with Zenith Energy, HG Infra Secures BESS Contract, Ecoprogetti Delivers Solar Panels To SAEL Updated On Mon, Nov 25th, 2024 by Saurenergy Sungrow Partners with Zenith Energy to Power Australia’s Largest Off-Grid Hybrid Project Sungrow, a PV inverter and energy storage system provider, recently developed Australia’s off-grid hybrid renewable energy system in the Kathleen Valley Operation. Developed in collaboration with Zenith Energy and Liontown Resources, this initiative sets a new precedent for integrating renewable energy solutions in […] Read more
MPUVNL Invites Bids For 26 MW Rooftop Solar Project Updated On Mon, Nov 25th, 2024 by Saurenergy The Madhya Pradesh Corporation (MPUVNL) recently floated a tender to build on-grid and off-grid solar rooftop systems with a total 26 MW capacity. The last date for bid submission is December 31, 2024. The recent tender plans to develop solar projects in Madhya Pradesh (MP) and to bring standardization of rates and selection of contractors […] Read more