Asia Clean Capital and LONGI Solar Team Up to Build High Efficiency Distributed Solar PV Updated On Mon, Apr 3rd, 2017 by Saurenergy LONGI Solar has created a partnership with Asia Clean Capital to co-develop an identified 300 Megawatts Solar PV Projects in Mainland China. Asia Clean Capital has announced a cooperation agreement with LONGI LERRI Solar Technology Co., Ltd (“LONGI Solar”), a fully-owned subsidiary of LONGI Green Energy Technology Co., Ltd., to co-develop an identified solar PV […] Read more
VIZ-A-VIZ with Nanduri. Purushotham, Director Business Development, Topsun Energy Ltd, Updated On Mon, Apr 3rd, 2017 by Saurenergy “Topsun’s Mehsana facility has three integrated lines with cumulative capacity of 100Mw production line. Opportunity for manufacturing is ample with the ambitious plans of GOI but in my opinion better to opt for other BOC (balance of components) instead of modules manufacturing including cells Indian industry can compete globally and support GW scale domestic requirements.” Please give […] Read more
Schutten Solar Looks Forward to Expand its Crystalline Silicon Solar Module Market in India Updated On Tue, Mar 28th, 2017 by Saurenergy Schutten Solar, a high-tech enterprise engaged in the world-class advanced PV technology focuses to expand its crystalline silicon(C-si) solar module market within India. Within a short period of time, Schutten Solar has cemented its position as a leading crystalline silicon(C-si) module manufacturer and supplier in India. Under the dynamic and visionary leadership of Dao Xiang […] Read more
IREDA to sanction Rs 13,000 crore loan for renewables in FY18 Updated On Mon, Mar 27th, 2017 by Saurenergy Indian Renewable Energy Development Agency will be sanctioning Rs 13000 crore loan to meet the Government’s target of achieving 15 to 16 GW of renewable energy projects. State-run Indian Renewable Energy Development Agency (IREDA) will sanction Rs 13,000 crore for clean energy projects next fiscal in the country, vying for around 20 per cent of […] Read more
NTPC Plans to Achieve 32 GW Installed Capacity via Renewable Sources by 2032 Updated On Sat, Mar 25th, 2017 by Saurenergy Green masala bonds will be used by NTPC for financing renewable energy projects in accordance with applicable guidelines and regulations of Reserve Bank of India NTPC Ltd. has raised Rs. 2,000 crore through issuance of green masala bonds in overseas market under its USD 4 billion medium term note programme. The proceeds of these green […] Read more
RPO Compliance Needs To Improve Fast for India to Meet its Solar Installation Targets: Mercom Capital Updated On Wed, Mar 22nd, 2017 by Saurenergy India needs to install 90 GW of solar in five year – at a rate of 18 GW per year. Most states have specified RPO targets. However, due to the lack of enforcement of RPO regulations and the absence of penalties when obligations are not met, many of the state DISCOMs (distribution companies) are not […] Read more
GCL-Poly Energy Holdings Plans to Start Manufacturing Solar Modules in India Updated On Wed, Mar 22nd, 2017 by Saurenergy China’s one of the largest Solar Module Maker GCL-Poly Energy is in talk with Essel Group to set up a solar module manufacturing facility in India. China’s based solar equipment maker GCL-Poly Energy Holdings Ltd. reportedly plans to invest in India, attracted by the nation’s emerging green economy. As reported in the Livemint, GCL-Poly Energy […] Read more
HH Sheikh Mohammed bin Rashid Al Maktoum Inaugurates 200MW Second Phase of the Mohammed bin Rashid Solar Park Updated On Tue, Mar 21st, 2017 by Saurenergy Second phase of the Mohammed bin Rashid Al Maktoum Solar Park can generate clean energy for 50,000 residences in Dubai, and will reduce 214,000 tonnes of carbon emissions annually HH Sheikh Mohammed bin Rashid Al Maktoum, Vice President and Prime Minister of UAE inaugurated 200 megawatt (MW) second phase of the Mohammed bin Rashid Al […] Read more
India’s solar capacity to hit 20GW mark in next 15 months: Piyush Goyal Updated On Tue, Mar 21st, 2017 by Saurenergy “India could not have completely focused on Making in India’ in the last three years as being in the nascent stage, its solar power sector needed technological and financial boost from abroad to rapidly expand its horizons,” The installed solar power capacity in India is expected to double from 10GW to 20GW in next 15 […] Read more