Senior Process Engineer- Carbon Capture Updated On Mon, Oct 21st, 2024 by Saurenergy Responsibilities:- Technical lead on carbon capture, flue gas treatment, liquefaction, and intermediate storage & transport projects. Pre-feasibility, Feasibility, and FEED studies including CAPEX and OPEX estimation. Planning, design, construction, and integration of Green Fuels/Power-to-X solutions. Guiding and supervising colleagues in process flow diagrams, calculations, P&IDs, and system designs. Safety assessments (HAZID/HAZOP). · Contributing to continuously […] Read more
CERC Takes Into Account PSPs, Offshore Wind, Changes Transmission Rules Updated On Mon, Oct 21st, 2024 by Saurenergy The Central Electricity Regulatory Commission (CERC) has made changes to the rules about how costs are shared for using the Inter–State Electricity Transmission System (ISTS) These new rules have been named CERC (Sharing of Inter-State Transmission Charges and Losses) (Fourth Amendment) Regulations, 2024. For power plants that connect to both the national (inter-State) and local […] Read more
Trina Solar, EGO Sign Pact To Boost Utility-Scale Projects In Italy Updated On Fri, Oct 18th, 2024 by Saurenergy Trina Solar’s International Systems Business Unit, the utility-scale solar and battery storage project development arm of Trina Solar Co, Ltd, has signed a 15-year Power Purchase Agreement (PPA) with EGO, an Italian energy management company owned by the Shell Group. This contract encompasses nine projects, totaling 69 MWp located across various regions in Italy. These […] Read more
NTPC Announces Winners of 1200 MW Hybrid Tender Updated On Fri, Oct 18th, 2024 by Saurenergy NTPC LImited has now announced the winners of its 1200 MW solar-wind hybrid project tender. As per the details of the tender results, five companies won the tender in different capacities. The lowest bid for the tender was quoted by Rays Power, Refex Green and SAEL Limited. These firms quoted a price of Rs 2.50/kWh. […] Read more
Prozeal Gets SECI’s Solar Plus Battery Energy Storage Project In Leh Updated On Fri, Oct 18th, 2024 by Saurenergy The Solar Energy Corporation of India (SECI) allotted Gujarat-based solar company Prozeal Green Energy a solar plus battery energy storage project at Leh. SECI, earlier had issued a tender for selection of project developers for a 25 MW (AC) Solar PV Power Plant (50 MWp) with a 20 MW/50 MWh battery energy storage system at […] Read more
Azure Completes Rs 2400 cr Refinancing Updated On Thu, Oct 17th, 2024 by Saurenergy Azure Power Global Limited, has announced the successful completion of its ₹24 billion refinancing transaction, structured as an INR Term Loan underwritten solely by REC Limited. Following this transaction, the company has successfully prepaid its Green Bonds, originally issued in 2019 for $350 million and backed by 10 solar projects commissioned between 2016 and 2019. […] Read more
AMPIN Achieves Financial Closure For 200MWp Hybrid Project Updated On Thu, Oct 17th, 2024 by Saurenergy Renewable energy company AMPIN Energy Transition has announced financial closure for its 200MWp Solar-Wind Hybrid project situated in the state of Rajasthan. The green loan financing for the project has been secured from Standard Chartered. The total investment for this project is valued at Rs 944 crores (~USD113 Million). Upon completion, the solar-wind hybrid plant is expected […] Read more
Microsoft, Google, and Now Amazon- Is Nuclear Hip Again? Updated On Thu, Oct 17th, 2024 by Saurenergy Last month, on September 20 came the news that Microsoft and Constellation Energy, the utility that owns Three Mile Island nuclear power facility, have inked a deal that would help restart Unit 1 at the Three Mile Island Nuclear Generating Station. the deal marked the first time a shuttered nuclear plant in the US was […] Read more
SJVN Invites Bids for 100 MW Wind Projects In Gujarat Updated On Thu, Oct 17th, 2024 by Saurenergy SJVN Green Energy Limited (SGEL), a SJVN Limited subsidiary sought to develop GETCO-connected wind power project with the operation and maintenance for 10 years. SGEL sought bids till 14th November 2024. To build this project, the developers are expected to use the ‘Revised List of Models & Manufacturers’ listed Wind Turbine Generators (WTGs) as issued […] Read more