Winning Bids Cross Rs 3/kWh In SECI’s 1 GW Solar Tender Updated On Thu, Dec 26th, 2024 by Saurenergy In an ominous sign of changing market dynamics, SECI’s 1000 MW Tranche XVIII tender for ISTS connected solar projects has attracted winning bids, all over Rs 3/kWh. The tender, released in September this year, has ReNew Solar Power( 250 MW at Rs 3.04), Acme Solar holdings (300 MW at Rs 3.05) and Adani Green Energy […] Read more
NTPC-REL Floats 1.4 GW Tender To Build UP Solar Parks Project Updated On Tue, Dec 24th, 2024 by Saurenergy NTPC Renewable Energy, a subsidiary of NTPC Green Energy, has issued a tender to develop a 1,400 MW grid-connected solar project in two solar parks, namely Lalitpur (2×300 MW) and Chitrakoot (2×400 MW), in Uttar Pradesh (UP). The tender invites bids until January 13, 2025. The tender offers a Balance of System (BoS) package for […] Read more
Assistant Manager Updated On Fri, Dec 20th, 2024 by Saurenergy Responsibilities:- Test or evaluate photovoltaic (PV) cells or modules. Review specifications and recommend engineering or manufacturing changes to achieve Solar design objectives. Perform thermal, stress, or cost reduction analyses for solar systems. Develop standard operation procedures and quality or safety standards for solar park. Provide technical direction or support to installation teams during installation, start-up, testing, […] Read more
Senior Engineer – Quality Assurance & Control Updated On Fri, Dec 20th, 2024 by Saurenergy Responsibilities:- Good knowledge on Blade manufacturing Ability to setup & use NDT (UT) equipment’s and relevant analysis software Perform Hand & Machine UT Scan Fluent in English (Oral & Written) Proficient in Microsoft office for reporting day to day development Ability to work in a time-sensitive situation & get thing done with quality On time […] Read more
HPERC Rolls Out Banking Regulation For Open Access Policy Updated On Fri, Dec 20th, 2024 by Saurenergy The Himachal Pradesh Electricity Regulatory Commission (HPERC) recently released an open access policy to allow connectivity and open access to electricity generated from green/renewable energy sources. It also includes energy generated from non-fossil-based waste-to-energy plants for use of the Intra-State Transmission System (InSTS) or the distribution system of the licensee(s) in the state or both. […] Read more
Prozeal, Kintech & SAEL Secure GUVNL’s 500 MW Solar Auction Updated On Thu, Dec 19th, 2024 by Saurenergy GUVNL recently announced seven winners of its 500 MW grid-connected solar power projects with an additional 500 MW greenshoe option. Under its Phase XXV auction, it allocated bids to S.B.B. Mouldings, Kintech Synergy, Enertech Fuel Solutions, Prozeal Green Energy, Ausom Enterprise, Drashta Green Power, and SAEL Industries. The tender for this project was released in […] Read more
Federal Bank, Ecofy Tie Up For Boosting Rooftop Solar Financing Updated On Wed, Dec 18th, 2024 by Saurenergy Federal Bank has announced partnering with green fintech company Ecofy to offer innovative financing solutions for MSMEs investing in commercial rooftop solar installations. This collaboration marks one of the first comprehensive co-lending partnerships specifically designed to address the unique solar financing needs of the MSME sector, the companies said. The program targets financing 3,600 kW […] Read more
Inox Wind Wins 60 MW Order From Serentica For Karnataka Project Updated On Wed, Dec 18th, 2024 by Saurenergy Inox Wind Limited (IWL), a wind energy solutions provider, today announced bagging a 60 MW order from Serentica Renewables (Serentica), a commercial and Industrial (C&I) focused renewable energy company in India. This order is to supply 3 MW class turbines and will be delivered within H1 CY25. Additionally, IWL will provide multi-year post-commissioning Operations and […] Read more
NTPC Issues BoS Tender For 1.5 GW Of Solar Project At Bikaner Updated On Tue, Dec 17th, 2024 by Saurenergy NTPC Renewable Energy has recently released a tender to develop a 1.5 GW grid-connected solar project in Rajasthan. It issued this tender through a joint venture with NTPC Green Energy Limited (NGEL) and Rajasthan Rajya Vidyut Utpadan Nigam Limited (RVUNL). The tender offers a ‘Balance of System Package’ to develop the project at RVUNL’s Solar […] Read more