After Record 2020, South Korea To See Moderation In Solar Growth Updated On Fri, Mar 26th, 2021 by Saurenergy South Korea, which has emerged as an unexpected bright spot for growth in the past three years, added almost 4.1 GW of solar in 2020.That places the country well above other relatively large markets like India for instance, which added barely 3.2 GW in 2020. The large additions in South Korea have been a function […] Read more
Bharti Airtel Increases Stake in Avaada SPV for Captive Solar Project Updated On Thu, Mar 25th, 2021 by Saurenergy Bharti Airtel has now acquired an additional 3.33% equity in the Avaada SPV – Avaada MHBuldhana for a reported Rs 2.914 crore. Bharti Airtel has announced that in furtherance to its acquisition of 5.2 percent equity shares in Avaada MHBuldhana Private Limited – a Special Purpose Vehicle (SPV) of the Avaada Group formed for the […] Read more
Specialist (Carbon Capture & Utilisation) Updated On Wed, Mar 24th, 2021 by Saurenergy The incumbent shall be responsible for conceptualising and implementing Carbon Capture and Utilisation (CCU) projects in India and abroad. He/She shall be responsible to design, procure, erect and commission CCU projects in the field of green chemicals synthesis (like methanol, syngas etc.) for pilot and commercial projects. Qualifications: Degree in Engineering in Electrical/ Mechanical/ Electronics/ […] Read more
Uttar Pradesh Floats Tender for 75 MW of Grid-Connected Solar Projects Updated On Wed, Mar 24th, 2021 by Saurenergy Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA) has floated an e-tender for setting up a 75 MW grid-connected solar PV power project in UP solar park, Uttar Pradesh. As part of the Government of India’s target to achieve a cumulative capacity of 100 GW Solar PV installations by the year 2022, UPNEDA wishes […] Read more
Solar Firms Almost Unanimous on 10 kW Rule for Net-Metering – It’s a Disaster Updated On Wed, Mar 24th, 2021 by Saurenergy While industry reaction to the new rules from the Ministry of Power that mandates net metering upto a limit of 10 kW only have been well reported, we decided to speak to installers across states to get a broader view. What we see is a very clear divide between a vast number of smaller installers, […] Read more
SECI Extends Bid Deadline for 25 MW BCCL Solar Plant in West Bengal Again Updated On Wed, Mar 24th, 2021 by Saurenergy SECI has again extended the bid deadline for its tender for setting up a 25 MW solar plant at the Bhojudh Coal Washery of BCCL in West Bengal The Solar Energy Corporation of India (SECI) has notified that the bid submission deadline for its tender for setting up of 25 MW solar PV power plant […] Read more
Goa Adds 50 Electric Buses to its Fleet Under FAME II Scheme Updated On Wed, Mar 24th, 2021 by Saurenergy Goa has added 50 ‘Make in India’ electric buses from Kadamba Transport under the FAME II Scheme. Chief Minister of Goa, Dr. Pramod Sawant, waved off the ‘Make in India’ Electric buses (e-buses). In a first-of-its-kind move, Goans will be now able to travel in zero-emission and noiseless e-buses deployed by Olectra Greentech Limited, a […] Read more
H24US Drives the Science of Hydrogen Separation Updated On Tue, Mar 23rd, 2021 by Saurenergy H24US has announced that its advanced polymer membrane technology has the best-known observed performance in selecting hydrogen (selectivity) from other gases with very high throughput (permeability) indicating that this technology is one of the current leaders in this field. This outstanding performance was contrasted to other membranes via direct comparison of published data in an […] Read more
BHEL Secures 1st Overseas Contract for Grid-Tied Solar Plant in Mauritius Updated On Tue, Mar 23rd, 2021 by Saurenergy BHEL has secured its maiden overseas turnkey contract for a grid-tied 8 MW solar power plant to be developed in Mauritius on an EPC basis. Bharat Heavy Electricals Limited (BHEL) has announced that it has achieved another milestone in international business by securing its maiden overseas turnkey contract for a grid-connected 8 MW ac solar […] Read more