20 GW Sun Cable Darwin Project On Track Again Under Atlassian Founder Updated On Thu, Sep 7th, 2023 by Saurenergy Australian Software billionaire and Atlassian Founder Mike Cannon-Brookes has ensured the revival of the 20 GW, trans ocean Sun Cable Project, taking it out of administration by assuming full ownership. The project, to be set up near Darwin in Australia’s sparsely populated Northern Territory, is planned with a 20 GW solar footprint, besides 40 GWh […] Read more
TERI Issues RFP for 20 MW/ 40 MWh Battery Energy Storage Systems (BESS) in Delhi Updated On Wed, Sep 6th, 2023 by Saurenergy TERI (The Energy & Resources Institute) has issued an RFP for the design, supply, testing, installation, commissioning, operation and maintenance of 20 MW/ 40 MWh Battery Energy Storage Systems (BESS) in Delhi under tariff-based competitive bidding. The last date for submission of bids is September 22, 2023. Bids open on September 29, 2023. The scope […] Read more
NTPC, Oil India Sign MoU for Boosting Renewable & Green Initiatives Updated On Fri, Sep 1st, 2023 by Saurenergy Indian power behemoth NTPC Limited and state-owned Oil India Limited have now signed a Memorandum of Understanding (MoU) for collaboration in the business of exploration, development and production of crude oil and natural gas. The agreement was recently signed between the government enteprises to explore collaboration in Renewable Energy, Green Hydrogen and its derivatives, geothermal […] Read more
Longi Crosses 1 GW Milestone In Middle East, Looks Ahead To Much More Updated On Mon, Aug 21st, 2023 by Saurenergy Chinese solar major Longi has announced the shipping of over 1GW of solar modules to the Middle East distribution solar market by the second quarter of 2023. The number is a significant milestone for Longi as well as underscoring the high demand and interest in solar solutions for the middle east region. Solar majors have […] Read more
ACEN Inks RECAU Agreement with Laguna Lake Development Authority in Philippines Updated On Fri, Aug 11th, 2023 by Saurenergy Makati-based ACEN, through its subsidiary companies, entered into a significant Renewable Energy Contract Area Utilization (RECAU) agreement with the Laguna Lake Development Authority (LLDA) in the Philippines. The purpose of this agreement is to secure the lease of 800 hectares of Renewable Energy Areas (REAs) located in Laguna. This pivotal arrangement signifies ACEN’s commitment to […] Read more
RECPDCL Issues RFS for Wind Power Developers for 100 MW Wind Power Projects Updated On Thu, Aug 3rd, 2023 by Saurenergy REC Power Development and Consultancy Limited, a wholly owned subsidiary of REC Limited, a Maharatna company under the Ministry of Power, invites bids for the selection of wind power developer(s) for setting up of 100 MW ISTS-connected wind power project(s) in India via tariff-based competitive bidding (TBCB) process on Build Own Operate (B-O-O) basis unedr […] Read more
Tripura Chalks Out ‘Tripura Energy Vision 2030 Roadmap’ Updated On Fri, Jul 28th, 2023 by Saurenergy The Power Minister of Tripura, Ratan Lal Nath, has revealed that the state government has worked out at a plan that sets sights on generating close to 500 MW of power via solar energy. The goal is to be achieved by 2030. He further added that Germany’s Deutsche Gesellschaft Fur international Zusammenarbeit (GIZ) executed a […] Read more
SECI Issues Tender for Selection of Consultancy Firm for 100 MW SPV Project with 40 MW/120 MWh BESS Updated On Tue, Jun 13th, 2023 by Saurenergy The Solar Energy Corporation of India (SECI) has issued a tender for consulting services for the selection of consultancy firm for owners engineer services for 100 MW SPV Project along with 40 MW/120 MWh BESS at Rajnandgaon, Chhattisgarh and 100 MW Floating Solar PV Project at Getalsud, Jharkhand. The last date for submission of bids […] Read more
MP Allots 525 MW Of Pumped Storage Project At Indira Sagar To NHDC Updated On Fri, Jun 9th, 2023 by Saurenergy The Renewable Energy department of Madhya Pradesh (MP) allotted a 525 Megawatt (MW) of Pumped Storage Project (PSP) to the NHDC Limited, a joint venture of the National Hydro Power Corporation (NHPC) and the Madhya Pradesh government. As per the mandate, the PSP would be constructed using the Indira Sagar reservoir and Omkareshwar reservoir under […] Read more