Q4: Jinko’s Solar Shipments Drop, Revenue Falls 37.1% YoY Updated On Thu, Mar 27th, 2025 by Saurenergy JinkoSolar Holding Co., Ltd. (JinkoSolar), a solar module manufacturer, has released its unaudited financial results for the fourth quarter and full year ended December 31, 2024. The company reported an 18.3% year-over-year (YoY) increase in module shipments for the full year, reaching 92.9 GW. During its earnings call, JinkoSolar revealed that 60% of its modules […] Read more
First Solar India’s Disconnect: Big Factory, Small Home Footprint Updated On Mon, Mar 24th, 2025 by Saurenergy First Solar, Inc., a US solar manufacturer, ventured into India manufacturing business with the intention of serving the domestic India market as it inaugurated a fully vertically integrated solar manufacturing plant in Tamil Nadu with a capacity of 3.3 GW. The firm also had the distinction of making it to India’s ALMM list as the […] Read more
Borosil Renewables Reports Rs. 8.64 Cr Loss in Q3 FY25 Updated On Tue, Feb 18th, 2025 by Saurenergy Indian solar glass manufacturer Borosil Renewables recently announced its financial results for Q3 FY25. The company reported an EBITDA of Rs. 20.89 Cr, a significant decline from Rs. 52.88 Cr in the previous quarter. As a result of the lower EBITDA, Borosil posted a post-tax loss of Rs. 8.64 Cr in Q3 FY25, compared to […] Read more
Waaree RTL Gets 40 MWh BESS Order From Continuum Green Energy Updated On Fri, Feb 14th, 2025 by Saurenergy Waaree Renewable Technology (Warree RTL) has secured a Letter of Award (LOA) for an EPC work order for a 40 MWh battery storage system from Continuum Green Energy Limited. The company disclosed the project order size in a regulatory filing, which said, “The project order size is approximately INR 40 Cr.” Additionally, the company mentioned, […] Read more
Premier Energies Secures Rs. 1,234 Cr Solar Module Supply Orders Updated On Fri, Feb 14th, 2025 by Saurenergy Leading Hyderabad-based solar manufacturer, Premier Energies has received two orders from its existing customers totaling Rs.1234 Crores. The company shared this update in a regulatory filing stating, “The supply of solar modules is scheduled to commence in April 2025.” The Indian solar module and solar cell manufacturer in its latest financial results for the third […] Read more
Gensol Q3-9 Month Revenues Up 42% Updated On Wed, Feb 12th, 2025 by Saurenergy Gensol Engineering Limited, one of the oldest players in the renewable energy sector specializing in solar engineering, procurement, and construction (EPC) services, along with electric mobility solutions, announced its unaudited consolidated financial results for the quarter & nine months ended December 31st, 2024 (Q3 & 9M FY25). Consolidated Financial Summary: Particulars (₹ in Crore) Q3 […] Read more
Inox Wind Q3 FY25: Revenue Up 96%, EBITDA Jumps 192% YoY Updated On Sat, Feb 1st, 2025 by Saurenergy Inox Wind Limited (IWL), a wind energy solutions provider announced a strong show for its financial results during the quarter ended December 31, 2024. In the quarter, the company’s order execution increased 82% YoY to 189 MW. The company’s revenue increased 96% year-over-year (YoY), and its EBITDA also grew 192% YoY. IWL’s order book stood […] Read more
Q3 FY25: ACME Solar’s PAT Up By 152% YoY, PAT Margin At 28% Updated On Wed, Jan 29th, 2025 by Saurenergy ACME Solar Holdings, in its Q3 FY25 financial results, reported a 152% year-over-year (YoY) increase in Profit After Tax (PAT). It also reported a 632.5% jump in its net profit on a Quarter-On-Quarter (QoQ) basis. The PAT margin reached 28%, while the net debt-to-equity ratio stood at 1.6x. The company’s total revenue increased by 9.9% […] Read more
Waaree RTL Gets 105 MWp Ground-Mount Solar Project For Rs. 277.20 Cr. Updated On Mon, Jan 20th, 2025 by Saurenergy Mumbai-based solar EPC company, Waaree Renewable Technologies Limited has secured a 105 MWp ground-mount solar power project. The company secured approximately Rs. 277.20 Crores (Excl. Taxes) order. The company said in the regulatory filing “The project is scheduled to be completed in the financial year 2025- 26, as per the terms of the order.” The […] Read more