Odisha EV Policy 2021: Targets 20% EV Registrations by Mid-decade Updated On Tue, Aug 31st, 2021 by Saurenergy The Odisha Government has released the Electric Vehicle (EV) Policy, 2021, which aims to accelerate the adoption of EVs, especially in the category of electric two-wheelers (E2W), three-wheelers (E3W), and light motor vehicles (E4W). The Government of India has adopted a National Electric Mobility Plan to cut its emission intensity by 35% below levels by […] Read more
Mechanical Engineer, eMobility – All Levels Updated On Thu, Aug 26th, 2021 by Saurenergy The Mechanical Engineer will conceptualize, manage the design, development, testing, technical documentation, and launch of new products and extensions to existing product lines. Primary Responsibilities:- Lead the mechanical design and development of electric vehicle powertrain components. Participate in all phases of the hardware development lifecycle (Requirements, Design, Analysis, Prototype, Test, and Release). Apply the appropriate Eaton […] Read more
Business Development Executive Updated On Fri, Aug 20th, 2021 by Saurenergy Roles and Responsibilities:- Prospecting & qualifying company product & services, profits, employee strength, etc.& generating prospectus leads from the assigned territory The incumbent will also be involved in generating quality Leads into USA Market by Cold Calling Desired Candidate Profile:- Candidate must have good experience for calling into the USA markets for inside sales.in engineering […] Read more
Pune’s goEgoNetwork EV Charging Startup Secures $2 Million Seed Funding Updated On Wed, Aug 18th, 2021 by Saurenergy Pune’s goEgoNetwork is an Indian EV charging startup that will provide EV chargers to you whether you are at home, at work, or traveling to your weekend getaway destination. Pune’s goEgoNetwork is electric vehicles (EV) Charging Startup Secures $2 Million Seed Funding. Recently the two-year-old startup has secured $2 million in seed funding to expand […] Read more
Senior CPQ Developer Updated On Fri, Aug 13th, 2021 by Saurenergy As a Senior CPQ Developer, you will work within the Flowserve business to understand requirements and implement solutions within an enterprise CPQ. A successful candidate requires the ability to master the administration and implementation of the software as well as firm understanding of the requirements from an engineering perspective to properly develop the optimal solution. […] Read more
Lead RPA Developer Updated On Fri, Aug 13th, 2021 by Saurenergy Here is a glimpse of what you will do:- Be the lead developer under HR PMO to support all the automation initiatives across whole HR organization. Keep enhancing the automation skillset to drive HR digitalization strategy. Be versatile to use different technologies to develop automation solutions. Here is some of what you will need (required):- Be skilful […] Read more
Over 5.17 Lakh EVs Registered over Three Years in India Under FAME Updated On Wed, Aug 11th, 2021 by Saurenergy The Ministry of Heavy Industries of India declared that India registered a total of 5,17,322 electric vehicles (EVs) over three years under the FAME scheme. Faster Adoption and Manufacturing of (Hybrid &) Electric Vehicles in India (FAME India) Scheme was launched in 2015 to promote the adoption of EVs in the country. At present, Phase-II […] Read more
Efforts by the EV Sector to Save the World’s Environment From Massive Carbon Emissions Caused by Vehicles Updated On Wed, Aug 11th, 2021 by Saurenergy Global emissions were around 23 billion metric tons before the turn of the century, currently, they had risen to 36.44 billion metric tons, a new high. Every year, billion tons of greenhouse gases are released into the atmosphere which is trapping heat and raising global temperatures. The only way to avoid all of these severe […] Read more
IEX’s Green Term-ahead Market Achieves 76% MoM Growth in July’21 Updated On Thu, Aug 5th, 2021 by Saurenergy Indian Energy Exchange (IEX) traded 7,322 MU volume and clocked 37% year-on-year growth in July 2021, as per the data on power demand published by the National Load Dispatch Centre. Further, national peak demand was registered on July 7, 2021, at 200.6 GW, which recorded a 17.6% YoY increase while the energy consumption at 125.5 BU […] Read more