Seraphim Joins the 500w Club, With S4 half Cell Series Updated On Tue, Dec 1st, 2020 by Saurenergy Jiangsu Seraphim Solar System Co., Ltd. (Seraphim), a world-class solar product manufacturer in China, has joined the growing band of manufacturers offering a 500 plus Watt module with the launch of its S4 half-cell series photovoltaic (PV) modules on December 1. Seraphim, which until last year claimed to have over 85 percent of its sales outside […] Read more
REInvest 2020- Decoupling From Solar, Higher Peaking Tariffs Key For Wind Energy Updated On Tue, Dec 1st, 2020 by Saurenergy At 38.26 GW of installed capacity till October 3, 2020, India is the fourth largest market for wind energy in the world. Yet, the industry has been overtaken by a sense of pessimism in the past couple of years, as fresh additions have slowed down, and multiple other issues have cropped up. Discussing this, and […] Read more
SECI Extends Bid Deadline for 200 MWdc Solar Plus 50 MW Storage Tender Updated On Fri, Nov 27th, 2020 by Saurenergy SECI has extended the bid submission deadline for its tender for 200 MWdc solar PV project along with 50MW /150 MWh storage in Chhattisgarh. The Solar Energy Corporation of India (SECI) in its latest notification has extended the bid submission deadline for its tender for the design, engineering, supply, construction, erection, testing and commissioning of […] Read more
PM Modi Strikes Optimistic Note On Future of Renewables In India At 3rd RE-invest Updated On Fri, Nov 27th, 2020 by Saurenergy Prime Minister Shri Narendra Modi inaugurated the 3rd Global Renewable Energy Investment Meeting and Expo (RE-Invest 2020) through video conferencing. The event is being held virtually this year. The theme for RE-Invest 2020 is ‘Innovations for Sustainable Energy Transition’, and it is organized by the Ministry of New and Renewable Energy. During the inaugural session […] Read more
BHEL Seeking Pre-Bid Tie-ups for 50 MW BESS Under SECI’s Solar Plus Storage Tender Updated On Thu, Nov 26th, 2020 by Saurenergy BHEL is looking to enter a pre-bid tie-up for 50 MW/ 150 MWh BESS for SECI’s solar plus storage tender that BHEL is participating in Chhattisgarh. BHEL has announced that it is participating in a tender for the design, engineering, supply, construction, erection, testing and commissioning of 100 MW (AC) solar PV project (200 MWp […] Read more
BHEL Tenders for Supply of Multi-crystalline Solar PV Cells Updated On Thu, Nov 26th, 2020 by Saurenergy The Solar Business Division of BHEL has issued a tender for the supply of multi-crystalline solar PV cells The Solar Business Division (formerly Electric and Photovoltaic Division) of Bharat Heavy Electricals Limited (BHEL) has issued a tender for the supply of multi-crystalline solar photovoltaic (PV) cells (157 mm-5BB-4.62 Wp) as per BHEL technical specification. It […] Read more
DSM Advanced Solar launches new ‘all purpose’ Endurance backsheet Updated On Tue, Nov 24th, 2020 by Saurenergy Royal DSM, a global science-based company in Nutrition, Health and Sustainable Living, today announced the launch of the ‘all purpose’ Endurance backsheet D15: a product that fills a gap in the solar market by delivering superior protection for a wide range of solar modules at an ideal performance-cost ratio. As a leader in co-extruded backsheet […] Read more
Exide Increase Stake in Li-ion Battery JV With Leclanche to 80.15% Updated On Tue, Nov 24th, 2020 by Saurenergy Battery maker Exide Industries has increased its stake in its JV with Swiss firm Leclanche to 80.15 percent with a further investment of Rs 33.17 crore Battery maker Exide Industries has announced that it has increased its stake in its joint venture (JV) with Swiss firm Leclanche to 80.15 percent with a further investment of Rs 33.17 crore by way of […] Read more
With Fresh Price Lows In Auctions, Are Solar Projects Awaiting PSA’s Truly Safe? Updated On Tue, Nov 24th, 2020 by Saurenergy In the last month and more, there have been multiple reports about the failure of the Solar Energy Corporation of India (SECI), a key nodal body that has been conducting utility scale solar auctions to sign PPA’s (Power purchase Agreement) with winning developers. SECI in turn blames it on the delay on the part of […] Read more