New 3D Solar Cell Design Could Revolutionise PV Manufacturing Updated On Mon, May 6th, 2019 by Saurenergy The innovative 3D design removes many of the manufacturing process steps required by existing photovoltaics (PV) modules An innovative 3D solar-cell design with a radically different architecture that can drive down the costs of cell manufacture may define the future of renewable energy as it potentially reduces optical losses within a device, according to UK […] Read more
APEDB Signs Rs 200 Cr MoU With Urja Global For EV and Battery Manufacturing Plant Updated On Thu, Mar 14th, 2019 by Saurenergy Andhra Pradesh Economic Development Board (APEDB) and Urja Global have signed a Memorandum of Understanding (MoU) for setting up a new plant for manufacturing high technology Lithium-Ion Batteries and electric vehicles for the electric mobility ecosystem. Through this MoU, Urja Global would invest Rs. 200 crore and shall create 250 direct and over 1000 indirect […] Read more
PRE-BID MEETING : SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 3GW ISTS CONNECTED SOLAR PV POWER PLANT LINKED WITH SETTING UP OF 1.5GW (PER ANNUM) SOLAR MANUFACTURING PLANT UNDER GLOBAL COMPETITIVE BIDDING (PHASE-II) Updated On Wed, Feb 6th, 2019 by Saurenergy This has reference to the RfS No. SECI/C&P/RfS/1.5GW MANUFACTURING/P-2/012019 regarding the RfS Selection of Solar Power Developers for Setting up of 3GW ISTS Connected Solar PV Power Plant linked Setting up of 1.5GW (Per Annum) Solar Manufacturing Plant under Global Competitive Bidding (Phase-II). The Pre-Bid Meeting has been rescheduled as per following details Date : […] Read more
Amendment-IV: Selection of Solar Power Developers for Setting up of 10GW ISTS Connected Solar PV Power Plant Linked 3GW pa Solar Manufacturing Plant Under Global Competitive Bidding (Phase-I) Updated On Fri, Nov 2nd, 2018 by Saurenergy This has reference to the RfS No. SECI/C&P/RfS/5GW MANUFACTURING/P-1/052018 dated 25.05.2018 regarding Selection of Solar Power Developers for Setting up of 10GW ISTS Connected Solar PV Power Plant linked with 3GW (Per Annum) Solar Manufacturing Plant under Global Competitive Bidding (Phase-I). The Amendment-IV to RfS documents have been uploaded on www.tcil-india-electronictender.com (Only viewed on Microsoft Internet explorer 10.x or above browser) and […] Read more
Gov’t Cuts Component Manufacturing Requirement to Prevent High Tariff Bids in Solar Tender Updated On Mon, Sep 3rd, 2018 by Saurenergy The government has also brought down the maximum permissible tariff rate for the solar tender to Rs 2.75 per unit from an earlier cap of Rs 2.93. In a bid to attract healthy number of developers in a recent solar auction and prevent higher tariff bids from the bidders, the government has reduced the component […] Read more
POSTPONEMENT OF THE RFS UPLOADING : SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 5GW (PER ANNUM) SOLAR MANUFACTURING PLANT LINKED WITH POWER PURCHASE AGREEMENTS (PPAS) FOR SOLAR PV POWER PLANT Updated On Tue, May 15th, 2018 by Saurenergy This has reference to the NIT No. SECI/C&P/RfS/5GW MANUFACTURING/P-1/052018 published dated 28.04.2018 regarding the RfS Selection of Solar Power Developers for Setting up of 5GW (Per Annum) Solar Manufacturing Plant linked with Power Purchase Agreements (PPAs) for Solar PV Power Plant under Global Competitive Bidding (Phase-I) The RfS documents for the captioned NIT which was […] Read more
Hevel Group starts manufacturing heterojunction solar modules, doubles its output Updated On Wed, Jul 5th, 2017 by Saurenergy Hevel’s production line delivers both solar modules and high-efficiency cells that can be exported for localized assembly in countries where the solar power plants are being constructed. Hevel Group has announced that it has started manufacturing heterojunction solar modules, doubling the capacity of its plant in Novocheboksarsk (Chuvash Republic) to 160 MW of solar modules […] Read more
Haryana govt. exempts solar devices from VAT to encourage manufacturing in the state Updated On Fri, May 19th, 2017 by Saurenergy Solar devices exempted from VAT includes solar lanterns, solar home systems, stand-alone street lighting systems, solar water heating systems, solar water pumping systems, solar cooker boxes and dish type, solar chargers or inverters and solar photovoltaic modules. The Haryana government has exempted solar devices, equipment or parts used in installation of solar power projects from […] Read more
US Allocates $1.3 Bn To Boost Lithium-ion Domestic Manufacturing Updated On Mon, Nov 25th, 2024 by Saurenergy To meet the growing domestic demand for electric vehicles (EVs), the United States (US) government has allocated a loan to finance a new facility in Terre Haute, Indiana, for manufacturing of lithium-ion battery separators. The government recently allocated a $1.3 billion direct loan ($1.2 billion in principal and $139.3 million in capitalized interest) to ENTEK […] Read more