SUBSCRIBE NEWS LETTER

ev manufacturing

Budget 2019 Live: Big Boost for finance, solar manufacturing and EV’s in Budget

As Finance Minister N Sitharaman presents her first budget 2019 in parliament today, track the news live for anything relevant to solar, renewables and electric mobility. Sumant Sinha, CMD, Renew Power, has already drawn up a wishlist. As India awaits the #UnionBudget2019 tomorrow, our CMD @sumant_sinha shares 7 areas where the #budget can make a […]

Read more

Govt Soon To Invite Bids for 40 GW EV Battery Manufacturing Plants

The government is considering a plan to establish a battery making capacity of 40 gigawatts (GW) to give a boost to its electrical vehicles and renewable energy initiatives. It will ask states to compete for the opportunity to set up internationally competitive facilities that will also service global markets. Domestic and global battery makers will […]

Read more

Govt. Launches Phased Manufacturing Programme to Aid the Domestic EV Market

The Government of India has launched the Phased Manufacturing Programme (PMP) to promote indigenous manufacturing of electric vehicles, its assemblies/sub-assemblies and parts/subparts/inputs of the sub-assemblies thereof. The Government approved the National Mission on Electric Mobility in 2011 and subsequently the National Electric Mobility Mission Plan 2020 was unveiled in 2013 by the then Prime Minister. […]

Read more

New 3D Solar Cell Design Could Revolutionise PV Manufacturing

The innovative 3D design removes many of the manufacturing process steps required by existing photovoltaics (PV) modules An innovative 3D solar-cell design with a radically different architecture that can drive down the costs of cell manufacture may define the future of renewable energy as it potentially reduces optical losses within a device, according to UK […]

Read more

APEDB Signs Rs 200 Cr MoU With Urja Global For EV and Battery Manufacturing Plant

Andhra Pradesh Economic Development Board (APEDB) and Urja Global have signed a Memorandum of Understanding (MoU) for setting up a new plant for manufacturing high technology Lithium-Ion Batteries and electric vehicles for the electric mobility ecosystem. Through this MoU, Urja Global would invest Rs. 200 crore and shall create 250 direct and over 1000 indirect […]

Read more

PRE-BID MEETING : SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 3GW ISTS CONNECTED SOLAR PV POWER PLANT LINKED WITH SETTING UP OF 1.5GW (PER ANNUM) SOLAR MANUFACTURING PLANT UNDER GLOBAL COMPETITIVE BIDDING (PHASE-II)

This has reference to the RfS No. SECI/C&P/RfS/1.5GW MANUFACTURING/P-2/012019 regarding the RfS Selection of Solar Power Developers for Setting up of 3GW ISTS Connected Solar PV Power Plant linked Setting up of 1.5GW (Per Annum) Solar Manufacturing Plant under Global Competitive Bidding (Phase-II). The Pre-Bid Meeting has been rescheduled as per following details Date : […]

Read more

Amendment-IV: Selection of Solar Power Developers for Setting up of 10GW ISTS Connected Solar PV Power Plant Linked 3GW pa Solar Manufacturing Plant Under Global Competitive Bidding (Phase-I)

This has reference to the RfS No. SECI/C&P/RfS/5GW MANUFACTURING/P-1/052018 dated 25.05.2018 regarding Selection of Solar Power Developers for Setting up of 10GW ISTS Connected Solar PV Power Plant linked with 3GW (Per Annum) Solar Manufacturing Plant under Global Competitive Bidding (Phase-I). The Amendment-IV to RfS documents have been uploaded on www.tcil-india-electronictender.com (Only viewed on Microsoft Internet explorer 10.x or above browser) and […]

Read more

POSTPONEMENT OF THE RFS UPLOADING : SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 5GW (PER ANNUM) SOLAR MANUFACTURING PLANT LINKED WITH POWER PURCHASE AGREEMENTS (PPAS) FOR SOLAR PV POWER PLANT

This has reference to the NIT No. SECI/C&P/RfS/5GW MANUFACTURING/P-1/052018 published dated 28.04.2018 regarding the RfS Selection of Solar Power Developers for Setting up of 5GW (Per Annum) Solar Manufacturing Plant linked with Power Purchase Agreements (PPAs) for Solar PV Power Plant under Global Competitive Bidding (Phase-I) The RfS documents for the captioned NIT which was […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll