Project Engineer-I and Trainee Engineer-I Updated On Tue, Nov 22nd, 2022 by Saurenergy Bharat Electronics Limited, a Navratna Company and India’s Premier Professional Electronics Company under Ministry of Defence, requires the following personnel on temporary basis for its Machilipatnam Unit: 1. REQUIREMENT OF PROJECT/ TRAINEE ENGINEERS:- Post code Name of the post No. of posts Upper age limit as on 01.10.2022* Minimum post qualification experience […] Read more
JV by Philadelphia Solar, Translucent Energy to Set Up 1.2-GW US Solar Module Facility Updated On Tue, Nov 22nd, 2022 by Saurenergy In a key development that would see the further expansion of solar power in the USA, Philadelphia Solar and Translucent Energy have joined forces in a strategic partnership to bring Tier-1-produced solar PV modules to the American market. Philadelphia Solar held that the JV – Trading Philadelphia Solar – will offer a full-range of utility […] Read more
Ahmedabad’s Matter Energy Unveils Geared Electric Motorcycle Updated On Tue, Nov 22nd, 2022 by Saurenergy A geared electric motorcycle was unveiled by Matter Energy, an Ahmedabad-based provider of integrated energy solutions. Orders will soon be accepted, and delivery will start in April 2023. For the geared electric motorcycle, the firm has great hopes. In addition to exporting to markets in Asia, Africa, and Latin America, it intends to open 200 […] Read more
Lead / Design Engineer Process Updated On Tue, Nov 22nd, 2022 by Saurenergy Provide technical guidance to the Process team in preparation/review of PFD, P & ID, HFD & Piping Material Specification, Sizing of Equipment, Utility Sizing, Heat Balance, Mass Balance, Hydraulic Calculation, Pump Selection, Process Instrumentation Datasheet, etc. Provide technical guidance in design/review using simulation soft wares namely, Bentley SisHyd, CHEMCAD & ASPEN, HTRI, CCTherm, B-JAC (HTFS), […] Read more
Technician- Wastewater/Recycling Updated On Mon, Nov 21st, 2022 by Saurenergy The primary responsibility of this job is to operate Ultra-Pure Water (UPW), Effluent Treatment Plant (ETP), Effluent Recycling Plant (ERP-UF/RO) & Drinking water plant processes as per work instructions. Assist in maintaining and upgrading existing UPW/ERP (UF/RO)/DRO equipment and perform day-to-day operational activities. Assist with engineering to develop new operating procedures, conduct plant operational trials […] Read more
Electrical System Design Engineer Updated On Mon, Nov 21st, 2022 by Saurenergy As a System Engineer, you will have the opportunity to innovate ideas, solutions for any problem statement or any requirement by designing an electrical system using various technical principals and product design applications. Contribute to the concept, design and development of Electrical system and Wiring Harness design while strengthening your skillset and mastery of engineering […] Read more
SECI Opens Up Bidding For Rs 19,500 Crore Solar PLI Updated On Mon, Nov 21st, 2022 by Saurenergy It’s finally here. The Solar Energy Corporation of India (SECI) has invited bids for the much awaited Solar PLI (performance Linked Incentive) tender that is expected to give a huge boost to the solar sector in terms of manufacturing prowess and backward integration domestically. The tender, under tranche II of the PLI program has a last […] Read more
NTPC Invites Bid for 325 MW Solar Modules Supply in Shajapur Solar Park, MP Updated On Mon, Nov 21st, 2022 by Saurenergy NTPC Renewable Energy Ltd has invited online bids for the supply 325 MW solar modules for solar projects situated in the Shajapur district, Madhya Pradesh. Late last year, NTPC had also tendered for consultants to help it with the 325 MW projects in the district. The last date for submitting the bid for this NTPC […] Read more
NTPC Floats BOS Tender With Nominal Capacity of 1GW Wind Energy Project Updated On Mon, Nov 21st, 2022 by Saurenergy National Thermal Power Corporation Limited (NTPC) has floated balance of system (BOS) tender package of an ISTS-connected wind energy project with a nominal capacity of 1000 MW anywhere in Karnataka. The last date for submitting the bid of this NTPC BOS tender is December 19, 2022, till 03:00 pm and the bid will be opened […] Read more