SUBSCRIBE NEWS LETTER

ev manufacturing

Adani Green Races Past 10 GW Operational Milestone In March’24

With a string of plants being operationalised all through March last month, Adani Green Energy Limited (AGEL)has surpassed 10,000 megawatts (MW) of a completely green operational portfolio. AGEL’s operational portfolio consists of 7,393 MW solar, 1,401 MW wind and 2,140 MW wind-solar hybrid capacity. The milestone is a key landmark for AGEL’s  goal of 45,000 […]

Read more

DCS HW Lead Engineer

Facilitates the EEEC II’s interests and activities for process system and solution projects. The position is responsible for project activities include, but not limited to, Lead Engineering. Responsibilities:- Follow Emerson’s project execution life cycle and maintain all documentation including technical, quality documents. Act as Lead for the project Act as primary interface with customer for […]

Read more

Integrated & Automation Testing Engineer

RESPONSIBILITIES:- Perform Integration testing during initial phase of Software testing. Perform Software benchmark & performance testing and share performance metrics with stakeholders. Compare & Analyze performance data with different releases Create full capacity setup of Hardware/Software and perform long run testing using scripts Periodically analyze long run/soak test setup for anomalies Developing test automation scripts […]

Read more

LG Energy, GM’s Sec. Ultium Cells Plant Begin Production In Tennessee

Ultium Cells, a joint venture of South Korean-based LG Energy Solution and General Motors (GM), recently announced more than $2.3 billion in investment. This investment is undertaken to build its second battery cell manufacturing plant in the United States (US) in Spring Hill, Tennessee. Ultium Cells plans to build the new plant on land leased […]

Read more

Plant Electrical Maintenance – Diversity

Equipment Maintenance Conduct regular inspections, troubleshoot, repair, and perform preventive maintenance on factory electrical systems, machinery, and equipment to ensure operational reliability and safety. Electrical Troubleshooting Diagnose and resolve electrical faults, malfunctions, and breakdowns in a timely manner to minimize production downtime and maintain quality standards. Safety Compliance Ensure that all electrical systems and installations […]

Read more

Design Lead – Electrical (DC)

The person shall be responsible for the complete design and detailed engineering for Solar Power plants like Mini Grid and Mega watt scales plants ,roof top plants . The Design Lead shall manage and review  the entire design documents and drawings for a project  or a set of smaller projects including co-ordination with  other disciplines […]

Read more

COVER STORY: India Gears Up For Solar Waste Recycling Challenge

The latest report from the Central Electricity Authority (CEA) states that India’s total solar energy capacity crossed 75 Gigawatts (GW) by the end of February this year. According to its own estimates, the country will need 292 GW of total solar capacity by 2030. With the steady additions of solar power to the Indian grid, […]

Read more

Nordcell Plans 1.2 GW Module Plant In Sweden

Going against the grain of recent announcements of stress in the solar manufacturing sector in Europe, Swedish manufacturer Nordcell has shared plans to build a 1.2GW module manufacturing plant in northern Sweden, termed GIGA One. Nordcell said it is evaluating sites for the facility and hoped to begin production as early as the first half […]

Read more

ALMM To Rule Solar From April 1, 2024 in India

Putting to rest any doubts over the future of sourcing for key solar projects, the Ministry of New and Renewable Energy (MNRE) has confirmed the deadline of March 31 for ending all ALMM related exemptions for developers in a terse, one page office memorandum. At SaurEnergy, we had predicted this outcome early this week. That […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll