Oswal Pumps Set To Ride Solar Boom With IPO Nod Updated On Fri, Jan 3rd, 2025 by Saurenergy The Securities and Exchange Board of India (SEBI) has approved the issuance of an Initial Public Offering (IPO) by Oswal Pumps. This move paves the way for the Karnal-based solar pump company to enter the stock market. The approval comes at a time when several solar companies and solar pump manufacturers have already entered the […] Read more
Manager- Materials Quality – Mechanical Updated On Thu, Jan 2nd, 2025 by Saurenergy ACCOUNTABILITIES:- Review & approval of supplier documents, MQP, Type tests , inspection reports of Steel Coils, Module mounting structures, Transmission Tower structures, various Conductors for Transmission, Construction steel, Robotic cleaning systems etc . Inspection and testing of above items by self and through TPIAs. Conducting, co ordinating and planning supplier/factory audits, product inspections and Proto […] Read more
Sungrow Aims For Large Share Of Residential, Storage Segments in 2025 Updated On Thu, Jan 2nd, 2025 by Saurenergy Sunil Badesra, Country Head (India and South Asia) for Global inverter leader Sungrow has reason to feel satisfied. Not only has the firm had a stellar 2024 in India, but the future looks even more promising thanks to the strong demand in the market, and a lineup of product offerings from Sungrow India. New launches […] Read more
Tesla’s Shanghai Energy Storage Plant Begins Trial Production Updated On Thu, Jan 2nd, 2025 by Saurenergy US automobile company Tesla’s Shanghai energy storage Megafactory recently began trial production.The new plant is dedicated to manufacturing Megapacks, Tesla’s energy-storage batteries, with mass production expected to commence fully in the first quarter of 2025, Tesla China told Xinhua. The Megafactory is the first of its kind that Tesla has built outside the United States. […] Read more
Waaree Energies Bags 150MWp Solar Module Order Updated On Thu, Jan 2nd, 2025 by Saurenergy Indian solar module manufacturer Waaree Energies today announced bagging a new solar module order of 150MWp capacity. The company said that it bagged the order from a renewable energy company engaged in owning, developing and operating renewable power projects in India. “This is to inform you that the Company has today received an order for […] Read more
IREDA Sanctions Up 129% In Q3, Disbursements Rise 41% Updated On Thu, Jan 2nd, 2025 by Saurenergy Indian Renewable Energy Development Agency Ltd. (IREDA) has reported strong growth for the December 31, 2024 quarter. As per provisional figures, IREDA sanctioned loans worth ₹31,087 crore in third quarter, marking a 129% year-on-year (Y-o-Y) growth compared to ₹13,558 crore in the corresponding period last year. Loan disbursements also witnessed significant growth, increasing by 41% […] Read more
Construction Coordinator/Project Manager Updated On Mon, Dec 30th, 2024 by Saurenergy Primary Responsibilities:- Plan, coordinate, and supervise construction activities. Monitor project progress, budgets, and schedules. Collaborate with architects, engineers, contractors, and stakeholders. Ensure compliance with safety regulations and quality standards. Manage procurement of materials and resources. Prepare and present progress reports to clients and management. Qualifications:- Bachelor’s degree in Civil Engineering. Proven experience in project management […] Read more
Electrical Engineer (TBM) Updated On Mon, Dec 30th, 2024 by Saurenergy Responsibilities: TBM Electrical Systems: Oversee the design, installation, commissioning, and maintenance of all electrical systems on the TBM, including the main drive system, control systems, lighting systems, and communication systems. Develop electrical schematics, wiring diagrams, and control panel layouts. Troubleshoot electrical faults and implement corrective actions. Power Supply and Distribution: Design and implement the power […] Read more
Asst. Manager/Manager – SCM Updated On Mon, Dec 30th, 2024 by Saurenergy Technical skills:- Very Strong knowledge of Procurement of HT / LT Motor, Instrument Panels, Other Electrical Component and Control & Instrumentation components. Should be able to do the detailed Costing of Electrical Components and should do the rate negotiation effectively. Candidates having experience in Thermal Power Plan Equipment / EPC Projects will be preferred. New […] Read more