India’s Road Towards EV Adoption… Updated On Wed, Apr 24th, 2019 by Saurenergy When it comes to Electric Vehicles (EVs), India would certainly seem to be playing catch up with the rest of the world. Consider the fact that in China, they have already started worrying about a mini-bust in the sector, thanks to the huge number of startups and major players who have jumped in. Thus, even […] Read more
At a Loss For Bids, SECI Extends 3 GW Manufacturing Linked Tender Again Updated On Tue, Apr 23rd, 2019 by Saurenergy The deadline for submission has been extended from April 22, 2019, to May 14, 2019. The Solar Energy Corporation of India (SECI) has extended the deadline for bid submission on its tender for setting up 3 GW ISTS-Connected solar PV power plant linked with setting up of 1.5 GW (per annum) solar manufacturing plant. The […] Read more
BRPL and Shuttl Commit to EV Transition with Focus on Charging Infrastructure Updated On Thu, Apr 18th, 2019 by Saurenergy Through their EV100 membership, the two firms have pledged to switch their fleets to electric and install charging infrastructure where they have operations. BSES Rajdhani Power Limited (BRPL) and app-based mobility company Shuttl have become the latest Indian companies to join The Climate Groups’ EV 100 initiative. Shuttl operates nearly 30,000 rides daily to commuters […] Read more
MNRE Issues Revised Guidelines For Series Approval of SPV Modules Updated On Thu, Apr 18th, 2019 by Saurenergy The Ministry of New and Renewable Energy (MNRE) has issued revised guidelines for series approval of solar PV modules for conducting testing in test labs for implementation of Solar Photovoltaics Systems, Devices and Component Goods Order 2017. The guidelines are issued to facilitate labs/manufacturers in the formation of series of products for approval of product […] Read more
Solar Waste Management and Manufacturing Standards Policy Needed: Report Updated On Fri, Apr 12th, 2019 by Saurenergy The government needs to bring out a policy on solar module waste management and standards for use of material for manufacturing, according to consultancy Bridge To India. “There is an urgent need to formulate appropriate quality standards for use of environmentally sustainable materials in manufacturing of modules. This will help in minimising potentially hazardous end-of-life […] Read more
Siemens Gamesa’s Indian Manufacturing Units Start Equipment Export Updated On Thu, Apr 11th, 2019 by Saurenergy The ongoing trade tariff negotiations between China and the US is seen as an opportunity by Siemens Gamesa’s India manufacturing units to take part and meet the rising demand for wind energy equipment. Markus Tacke, Chief Executive Officer, Siemens Gamesa, responding to a query on the scope for Siemens Gamesa to increase its wind energy […] Read more
Jolywood and Imec Achieve Record 23.2% with Bifacial n-PERT Solar Cells Updated On Mon, Apr 8th, 2019 by Saurenergy The result was certified by the solar cells laboratory at the calibration and test center of Germany’s Institute for Solar Energy Research. Belgian micro and nano-electronic research center Imec, has announced that its n-PERT (Passivated Emitter and Rear Totally diffused) solar cells developed with Chinese bifacial solar panel maker Jolywood have reached a certified and […] Read more
Success of FAME II, Other Measures Help in Realizing High EV Penetration by 2030: Niti Report Updated On Sat, Apr 6th, 2019 by Saurenergy Niti Aayog in its report said that, “According to the analysis, if FAME II and other measures – in public and private space – are successful, India could realize EV sales penetration of 30% of private cars, 70% of commercial cars, 40% of buses and 80% of two and three-wheelers by 2030.” On the back […] Read more
Deadline Extension For SECI’s 3 GW Manufacturing-Linked Solar Tender Updated On Fri, Apr 5th, 2019 by Saurenergy The deadline for submission has been extended from April 4, 2019, to April 22, 2019. The Solar Energy Corporation of India (SECI) has extended the deadline for bid submission on its tender for setting up 3 GW ISTS-Connected solar PV power plant linked with setting up of 1.5 GW (per annum) solar manufacturing plant. The […] Read more