Siemens Gamesa’s Indian Manufacturing Units Start Equipment Export Updated On Thu, Apr 11th, 2019 by Saurenergy The ongoing trade tariff negotiations between China and the US is seen as an opportunity by Siemens Gamesa’s India manufacturing units to take part and meet the rising demand for wind energy equipment. Markus Tacke, Chief Executive Officer, Siemens Gamesa, responding to a query on the scope for Siemens Gamesa to increase its wind energy […] Read more
Jolywood and Imec Achieve Record 23.2% with Bifacial n-PERT Solar Cells Updated On Mon, Apr 8th, 2019 by Saurenergy The result was certified by the solar cells laboratory at the calibration and test center of Germany’s Institute for Solar Energy Research. Belgian micro and nano-electronic research center Imec, has announced that its n-PERT (Passivated Emitter and Rear Totally diffused) solar cells developed with Chinese bifacial solar panel maker Jolywood have reached a certified and […] Read more
Success of FAME II, Other Measures Help in Realizing High EV Penetration by 2030: Niti Report Updated On Sat, Apr 6th, 2019 by Saurenergy Niti Aayog in its report said that, “According to the analysis, if FAME II and other measures – in public and private space – are successful, India could realize EV sales penetration of 30% of private cars, 70% of commercial cars, 40% of buses and 80% of two and three-wheelers by 2030.” On the back […] Read more
Deadline Extension For SECI’s 3 GW Manufacturing-Linked Solar Tender Updated On Fri, Apr 5th, 2019 by Saurenergy The deadline for submission has been extended from April 4, 2019, to April 22, 2019. The Solar Energy Corporation of India (SECI) has extended the deadline for bid submission on its tender for setting up 3 GW ISTS-Connected solar PV power plant linked with setting up of 1.5 GW (per annum) solar manufacturing plant. The […] Read more
Urban Development Dept Issues Tender For 340 kW Rooftop Solar on HDMC Buildings Updated On Wed, Apr 3rd, 2019 by Saurenergy The last date for bid submission is May 8, 2019 The Urban Development Department (UDD) on behalf and for the Hubli – Dharwad Municipal Corporation (HDMC) has issued tender for setting up of rooftop solar projects totalling 340 kW on net metering or gross metering models at multiple locations owned by HDMC in the Hubballi […] Read more
BHEL and GAIL Sign Pact For Co-Development of Solar Power Projects Updated On Sat, Mar 30th, 2019 by Saurenergy State-owned gas utility GAIL India Ltd has signed an agreement with Bharat Heavy Electricals Ltd (BHEL) for cooperation in the development of solar power projects. “GAIL shall be the project developer and BHEL shall act as an engineering, procurement, construction and project management contractor,” the company said in a statement. BHEL shall also provide operation and maintenance services during […] Read more
Public Transport Permit Mandatory for Commercial EVs To Avail FAME-II Incentives Updated On Fri, Mar 29th, 2019 by Saurenergy The Faster Adoption and Manufacturing of (Hybrid) and Electric Vehicles (FAME) scheme in its second phase starting next week, has made Public transport Mandatory for commercial EVs. From April 1, the owners of commercial electric vehicles (three wheelers and four wheelers) will be required to have a public transport permit from a government agency in […] Read more
SECI Extends Deadline For 3 GW Manufacturing Linked Solar Tender Updated On Mon, Mar 18th, 2019 by Saurenergy The deadline for submission has been extended from March 18, 2019, to April 4, 2019. The Solar Energy Corporation of India (SECI) has extended the deadline for bid submission on its tender for setting up 3 GW ISTS-Connected solar PV power plant linked with setting up of 1.5 GW (per annum) solar manufacturing plant. The […] Read more
BHEL Installs First Solar-Powered EV Charging Stations on Delhi-Chandigarh Highway Updated On Wed, Mar 6th, 2019 by Saurenergy The project is covered under the Department of Heavy Industry’s FAME scheme. State-run Bharat Heavy Electricals Ltd. (BHEL) said the company is setting up a network of solar-based electric vehicle chargers on the Delhi-Chandigarh highway. The project is covered under the Department of Heavy Industry’s FAME scheme (Faster Adoption and Manufacturing of (Hybrid) & Electric […] Read more