SECI Extends Deadline For 3 GW Manufacturing Linked Tender Updated On Wed, May 15th, 2019 by Saurenergy The deadline for submission has been extended from May 14, 2019, to May 31, 2019. The Solar Energy Corporation of India (SECI) has extended the deadline for bid submission on its tender for setting up 3 GW ISTS-Connected solar PV power plant linked with setting up of 1.5 GW (per annum) solar manufacturing plant. The […] Read more
FAME Alone Not Enough to Boost EV Adoption Updated On Mon, May 6th, 2019 by Saurenergy FAME alone is not enough to reach the 2030 target, various measures as prerequisites are needed in this transition. Policies like FAME need to be supplemented with measures such as domestic manufacturing of vehicles, batteries, and components to boost mass adoption of electric vehicles by 2030, industry body Confederation of Indian Industry (CII) has said. […] Read more
Stable Prices for Lithium Could be Good News for India’s EV dreams Updated On Tue, Apr 30th, 2019 by Saurenergy From predictions of prices that would slow down battery development in 2016, to the reality of an almost 50% price drop in 2018, Lithium has been too volatile for comfort. The good news is, the prized metal, on which many EV plans hinge, might just be settling in for a period of stability. Lithium, ever […] Read more
Interview with Sanjeev Dakshini, Chairman, Raydean Industries Updated On Fri, Apr 26th, 2019 by Saurenergy Albeit India has seen significant growth in solar industry but as a contributor we feel that lack of application oriented approach and low government support to indigenous technological advancements are major hindrances in matching the potential today, believes Sanjeev Dakshini, Chairman, Raydean Industries, the Jaipur-headquartered solar module mounting structures (MMS) manufacturer. In conversation with Manu […] Read more
NBCIL Invites Developers For Setting Up Solar Projects Under CPSU-II Scheme Updated On Thu, Apr 25th, 2019 by Saurenergy The Corporation has identified factory lands spanning over 10.46 acres in Ghaziabad for the development of solar power plants. The National Bicycle Corporation of India (NBCIL), a Government of India Undertaking, with reference to SECI’s 2000 MW grid-connected solar PV projects under CPSU Scheme, Phase-II, Tranche-I has invited government producers interested in participating in the […] Read more
India’s Road Towards EV Adoption… Updated On Wed, Apr 24th, 2019 by Saurenergy When it comes to Electric Vehicles (EVs), India would certainly seem to be playing catch up with the rest of the world. Consider the fact that in China, they have already started worrying about a mini-bust in the sector, thanks to the huge number of startups and major players who have jumped in. Thus, even […] Read more
At a Loss For Bids, SECI Extends 3 GW Manufacturing Linked Tender Again Updated On Tue, Apr 23rd, 2019 by Saurenergy The deadline for submission has been extended from April 22, 2019, to May 14, 2019. The Solar Energy Corporation of India (SECI) has extended the deadline for bid submission on its tender for setting up 3 GW ISTS-Connected solar PV power plant linked with setting up of 1.5 GW (per annum) solar manufacturing plant. The […] Read more
BRPL and Shuttl Commit to EV Transition with Focus on Charging Infrastructure Updated On Thu, Apr 18th, 2019 by Saurenergy Through their EV100 membership, the two firms have pledged to switch their fleets to electric and install charging infrastructure where they have operations. BSES Rajdhani Power Limited (BRPL) and app-based mobility company Shuttl have become the latest Indian companies to join The Climate Groups’ EV 100 initiative. Shuttl operates nearly 30,000 rides daily to commuters […] Read more
MNRE Issues Revised Guidelines For Series Approval of SPV Modules Updated On Thu, Apr 18th, 2019 by Saurenergy The Ministry of New and Renewable Energy (MNRE) has issued revised guidelines for series approval of solar PV modules for conducting testing in test labs for implementation of Solar Photovoltaics Systems, Devices and Component Goods Order 2017. The guidelines are issued to facilitate labs/manufacturers in the formation of series of products for approval of product […] Read more