New Digital Asset Helps Customers Offset Their Carbon Footprint Updated On Fri, Sep 3rd, 2021 by Saurenergy US-based Terrapass has launched Terrapass Coin (TPSC), a digital asset that works as an ERC-20 token on the Ethereum blockchain system. With Terrapass Coin, customers can own, buy, sell, trade, or offset their carbon footprint by managing their TPSCs received through designated Terrapass products, giving them control of their carbon offsets like never before, said […] Read more
RWE to Procure 200 MW of Storage from LG for US Solar Project Updated On Thu, Sep 2nd, 2021 by Saurenergy German company RWE Renewables has signed contracts with South Korea-based LG Energy Solution to receive an integrated battery energy storage system (BESS) for two of RWE’s upcoming projects with co-located solar PV facilities in the U.S. “We’re delighted to join forces with LG Energy Solution to secure equipment helping us realize two important solar plus […] Read more
Developing Energy Storage Key for India’s Decarbonisation, finds Study Updated On Thu, Sep 2nd, 2021 by Saurenergy In order to achieve its target of 450 GW of wind and solar by 2030, India’s wind and solar capacity must grow 20% year-over-year between 2022 and 2030. Developing energy storage is a key avenue for increasing India’s power system flexibility and the share of renewables and ultimately enabling India’s decarbonisation, finds a new study by the […] Read more
Engineer -Asset Operations & Management Updated On Thu, Sep 2nd, 2021 by Saurenergy In this role, you will be directly reporting to the Head of Section – Asset Operations & Management (AO&M). AO&M team is actively involved in conducting technical due diligence work for performance assessments, overseas investments, mergers and acquisitions and root cause analyses. Meticulous analyses of wind farm SCADA data from operational assets, identifying the losses and […] Read more
Thiruvananthapuram to Get Solar Plants at Key City Locales Updated On Thu, Sep 2nd, 2021 by Saurenergy The Smart City Thiruvananthapuram Ltd (SCTL) and its Smart Mission initiative are implementing solar power plant projects at important establishments in the capital city, including the Legislative Assembly Complex, in order to propagate sustainable technology. The estimated cost of the project is Rs 3.2 crores and it is expected to generate 607-kilowatt power. Officials believe […] Read more
Project Control Specialist II Updated On Thu, Sep 2nd, 2021 by Saurenergy Responsibilities:- Preparation/updation of Project Schedules consisting of Engineering, Procurement and Construction. Preparation/updation of progress ‘S’ curves for reporting progress to Client/Management Prepare and update deliverable schedules , critical activity report etc. Monitor and Control to meet the ‘Project Management ‘ requirement of schedule adherence through Planning Report, Progress Variance Analysis Report, Recovery Plans etc. Experience […] Read more
Associate Electrical Design and Analysis Engineer Updated On Thu, Sep 2nd, 2021 by Saurenergy The Boeing Company is hiring Associate Electrical Design and Analysis Engineer to join the Boeing India Engineering Team for Electrical Design Integration and will be based out of Bangalore. This position will report to Boeing India Engineering organization. A successful candidate will understand the importance of collaboration as these positions will focus on working directly with the Electrical […] Read more
Associate Application Refactoring and Transformation Engineer Updated On Thu, Sep 2nd, 2021 by Saurenergy Boeing India Engineering Digital Solutions team is currently looking for Associate Application Refactoring and Transformation Engineer to join their team in Bengaluru, KA. As a Software Engineer, you will be part of the Boeing India Engineering Digital Solutions team, which develops software applications and products that create direct value to its customers. We provide re-vamped work environments focused on […] Read more
Azure Power Hopeful of No Price Markdowns As PSA’s Finally Start on Its 4 GW Mfg Linked Win Updated On Thu, Sep 2nd, 2021 by Saurenergy At an analyst call post its Q1 results for 2022-23, Azure Power CEO Ranjit Gupta expressed the hope that there will be no price markdowns on the winning bid rates, for its 4 GW tender manufacturing linked tender wins. Azure had won a total project capacity of 4 GW, even as Adani Green Energy won […] Read more