Strong demand prospects for RE projects in C&I segment; regulatory risks key challenge: ICRA Updated On Mon, Mar 21st, 2022 by Saurenergy Demand prospects for renewable energy (RE) capacity addition in the commercial & industrial (C&I) segment remain solid, given the improved tariff competitiveness and growing sustainability/green initiatives by C&I players to meet their energy requirements through renewables, going forward, finds ICRA. If that sounds obvious, then the agency also flags risks, that really shouldn’t be there […] Read more
Punjab Invites Bids for 217 MW Solar Power Projects Under PM-KUSUM Updated On Mon, Mar 21st, 2022 by Saurenergy The Punjab Energy Development Agency (PEDA) has invited applications from farmers, groups of farmers, panchayats, cooperatives, Farmer Producer Organisations (FPOs) and water use associations in Punjab for setting up of solar power plants of individual capacity of 1MW, 1.5 MW and 2 MW. the move comes even as Punjab struggles to find a way out […] Read more
Green Hydrogen Electrolyzer SME (Process Engg) Updated On Mon, Mar 21st, 2022 by Saurenergy various water electrolysis technologies, challenges of each technologies, technology selection criterions, Vendor selection criterions. Integration aspects of various technologies w.r.t upstream and downstream systems, Balance of Plant design aspects, in-depth knowledge on interdependencies of various electrolysis technologies with Balance of Plant. Experience handling green hydrogen / electrolyzer projects at various stages like concept, engineering and […] Read more
L&T to Develop 280 MW Worth Solar Projects in Rajasthan and Gujarat Updated On Sat, Mar 19th, 2022 by Saurenergy Engineering conglomerate Larsen & Toubro (L&T) has announced that the company has got an order to develop a 245MW solar power project in Rajasthan. It has also received another order to build 35 MW (AC) photovoltaic capacity with 57MWh battery energy storage system in Gujarat. The project will be based in the Kutch district. Larsen & […] Read more
Senior Process Engineer Updated On Wed, Mar 16th, 2022 by Saurenergy Responsibilities:- This would involve frequesnt Travelling domestic/International. Pre-commissioning, commissioning and start up of continuous polymerization (CP) plant Verification of constructed piping and equipment layout w.r.t. PFD and PID Stabilization and achieving designed throughput and quality of process after startup Coordination with mechanical, electrical, instrument, utility in commissioning and start up of plant. Project progress monitoring, […] Read more
Senior Thermal Simulation Engineer, ESS, Electromobility Updated On Tue, Mar 15th, 2022 by Saurenergy We are currently looking for passionate engineer to join Electromobility team in the Energy Storage System Battery Pack CFD & Thermal Simulation & Analysis We are responsible for the development transition from conventional powertrains to electromobility and to secure a stepwise implementation in different segments/regions. We develop and drive the electromobility product portfolio for Trucks […] Read more
Four Solar Power Projects Worth 6.5 MW Floating Up in Chandigarh Soon Updated On Tue, Mar 15th, 2022 by Saurenergy Chandigarh Renewable Energy and Science and Technology Promotion (CREST) will develop four solar power projects totaling 6.5 MW capacity in different locations of Chandigarh. The cost of this solar expansion will be Rs 43 crore. As far as the projects are concerned, two will be first of their kind. These solar power projects will be […] Read more
Adani to Build Two Renewable Energy Projects in Sri Lanka Updated On Tue, Mar 15th, 2022 by Saurenergy The Adani Group has signed a Memorandum of Understanding (MoU) with the Sri Lanka Government bagging two renewable energy generation projects of considerable size in the neighbouring country. There is no official confirmation from either Adani Group or the Government of Sri Lanka, but it has been reported that the two projects will be based […] Read more
MoP issues guidelines for procurement & utilisation of BESS Updated On Mon, Mar 14th, 2022 by Saurenergy The Ministry of Power (MoP) has notified a new resolution of the Guidelines for the procurement and utilisation of battery energy storage systems (BESS) as part of generation, transmission and distribution assets, along with ancillary services. Specific Objectives of the Guidelines: To facilitate procurement of BESS, as part of individual RE power projects or separately, […] Read more