Jharkhand: DVC Opens Bid To Build 234 MW Floating Solar Project Updated On Tue, Dec 3rd, 2024 by Saurenergy Damodar Valley Corporation (DVC) recently released a tender to build a 234 MW grid-tied floating solar PV (FSPV) plant. This project is located on DVC’s Maithon Dam Reservoir at Maithon Jharkhand. The project included a 10-year comprehensive Operations and Maintenance (O&M). The last date for bid submission is 7th January 2025. The DVC tender said […] Read more
SECI’s 9.29 GW Of Renewable Projects Still Await Buyers Updated On Tue, Dec 3rd, 2024 by Saurenergy The growth in tendering for utility-scale projects marks the progress within the renewable energy sector. Recent data shared by the Solar Energy Corporation of India (SECI) indicated a list of renewable projects that are yet to see buyers. As per the prescribed practice, the renewable project developers who win tenders through SECI tie up with […] Read more
ACME Solar Set To Bring Its Maiden Wind Project Soon Updated On Mon, Dec 2nd, 2024 by Saurenergy ACME Solar, a renewable energy project developer, is transitioning beyond its solar-focused roots. The company is gearing up to commission its first-ever wind energy project, marking a significant step in its diversification journey. In a recent investors’ call, the company’s top management shared insights into its evolving strategy and plans for the future. Transition to […] Read more
Powergrid Seeks Bids To Build Solar Powered Green H2 In Rajasthan Updated On Fri, Nov 29th, 2024 by Saurenergy Powergrid recently released a tender to develop a transmission and distribution pilot project. The tender provides Package GH2-01 for the establishment of a solar PV-powered Green Hydrogen plant and a fuel cell-based microgrid pilot project. This project is located at the 400/220/33kV Neemrana substation in Rajasthan and includes Operation and Management (O&M) for 10 years. […] Read more
RE Supply Shift Poised To Favor North And South India Over West By 2032: SBI Caps Report Updated On Fri, Nov 29th, 2024 by Saurenergy India added 30 GW to its installed base (net basis) in the past 12 months, of which 75% was renewables, according to the latest data released in the SBI Caps report. Renewable energy has made notable progress recently, driven by fresh wind additions and a surge in energy storage system (ESS) tenders, as noted in […] Read more
THDC Issues Tender To Develop DPR For Floating Solar In Eight States Updated On Tue, Nov 26th, 2024 by Saurenergy The Tehri Hydro Development Corporation Limited (THDC India) has now planned to boost floating solar projects. It has issued a tender seeking bids to prepare Detailed Project Reports (DPRs) in this regard. These projects will be located in eight states. These include-Uttarakhand, Uttar Pradesh, Chhattisgarh, Madhya Pradesh, Karnataka, Kerala, Rajasthan, and Maharashtra. The last date […] Read more
Kerala Plans To Solarise Healthcare Facilities To Boost Efficiency Updated On Thu, Nov 21st, 2024 by Saurenergy The Agency For New and Renewable Energy Research & Technology (ANERT) has planned to solarise Kerala University of Health Sciences (KUHS). The institute campus is spread over a large area, favourable for solar projects. ANERT has planned to use several ways to bolster the growth of solar in the institute. ANERT has now also issued […] Read more
GPES Strengthens Board With Key Leadership Inductions Updated On Wed, Nov 20th, 2024 by Saurenergy GP Eco Solutions, the Noida-based solar and storage solutions firm that listed on the SME Exchange earlier this year, has moved to strengthen its board with the induction of three industry stalwarts in the form of KS Popli, AK Jain and UN Tripathi. Popli retired as Chairman and Managing Director at IREDA in 2019, after […] Read more
India Likely To Add More Than 26 GW Of Renewables In FY25: ICRA Updated On Tue, Nov 19th, 2024 by Saurenergy ICRA expects the installed renewable energy capacity (including large hydro) in India to increase to about 250 GW by March 2026 from the level of 201 GW as of September 2024. The capacity addition will be driven by the large project pipeline of over 80 GW, following the significant improvement in tendering activity in FY2024. […] Read more