SUBSCRIBE NEWS LETTER

energy tenders

SECI’s 100 MW Solar Plus 50 MW Storage Tender Gets Timeline Changes

SECI’s latest tender for the commissioning of a 100 MW solar along with a 50 MW storage in Chhattisgarh has seen alterations to some tender dates. Solar Energy Corporation of India’s (SECI’s) latest tender for the commissioning of a 100 MW (ac) solar project (200 MWdc) along with a 50 MW/ 150 MWh Battery Energy […]

Read more

UP Govt Working on Installation of 8000 Solar Borewells in the State

The UP Government plans on installing 8,000 solar-powered borewells in the state, almost 35 percent of them would come up in the Purvanchal district. The State Government of Uttar Pradesh (UP) has announced that it plans on installing 8,000 solar-powered borewells in the state in the coming days. As per the details provided almost 35 percent […]

Read more

“Draconian” Rule in Proposed Changes For Consumers To Hit Solar Sector: EPC Firms

The Ministry of Power has recently issued the draft rules providing for the ‘Rights of Electricity Consumers’ for the very first time. However, one provision included in the draft rules has managed to roil up smaller solar EPC companies at a key proposal within the rules. The power ministry stated that “having provided access to […]

Read more

Ministry of Power to set up Rs 2000 Cr JV to Ease Smart Meter Rollouts

Ministry of Power has begun the process to set up a Rs 2,000 crore JV for providing a CBIF to power Discoms for faster roll-out of smart meters in the country The Ministry of Power has begun the process to set up a Rs 2,000 crore joint venture (JV) for providing a common backend infrastructure […]

Read more

Over 27,000 EVs Supported Under FAME-II Scheme so far: Javadekar

The central government has so far supported over 27,000 electric vehicles (EVs) by way of demand incentive amounting to about Rs 95 crore under FAME-II The central government has so far (until September 10, 2020) supported over 27,000 electric vehicles (EVs) by way of demand incentive amounting to about Rs 95 crore under the phase […]

Read more

Another Deadline Extension for 15 MW Floating Solar Tender in Himachal

SECI, for the 4th time, has extended the bid deadline for its tender for setting up of 15 MW floating solar plant at the Nangal Pond in Himachal Pradesh. The Solar Energy Corporation of India (SECI) has once again extended the bid submission deadline for its tender for the selection of solar power developers for setting up of 15 […]

Read more

SECI Extends Timeline for its 97.5 MW Rooftop Solar PV Tender

SECI has extended the timeline for the implementation of 97.5 MW rooftop solar PV system shame for government buildings in different zones of India The Solar Energy Corporation of India (SECI) has notified of the extension in timelines for the implementation of 97.5 MW grid-connected rooftop solar PV system shame for government buildings in different […]

Read more

Gujarat Govt Revises Policy for Wasteland Allocation for RE Parks

The state government of Gujarat has revised its policy for allocating wasteland for renewable energy i.e. wind, solar and hybrid (wind and solar) power parks. According to the new provisions, the renewable project/ park developer(s) will have a period of 3 years from the date of handing over of the sites to build a minimum […]

Read more

India can Reduce Carbon Emissions by 35% in Next 10 Years: Javadekar

Environment Minister Prakash Javadekar has said he is hopeful that India would achieve its goal of reducing carbon emissions by 35% in the next ten years. Union Minister of Environment, Climate Change, and Heavy Industries Prakash Javadekar has said that he is hopeful that India would be able to achieve its goal of reducing its […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll