Civil Engineer Updated On Sat, Jun 19th, 2021 by Saurenergy To design and construct sub stations, transformer bays and switchyards, their inspection and inspection report writing, & preparation of plans, structural analysis and design, finite element modeling and analysis of special structures, foundation and retaining structure design, quantity-cost estimates. Site Execution of civil work within the time frame and within the Budget. Estimation and costing […] Read more
The Place of Renewables in India’s Future Power Grid Updated On Fri, Jun 18th, 2021 by Saurenergy Indian power sector, one of the largest in the world, comprises one synchronised national grid that serves the entire nation. In the last decade, the transmission system has expanded from 2.4 L circuit kilometres in 2011 to 4.4 L circuit kilometres in 2021, with inter-regional transfer capacity growing to 105 GW. A recent energy event […] Read more
Tata Motors & Tata Power Inaugurate India’s Largest Solar Carport in Pune Updated On Fri, Jun 18th, 2021 by Saurenergy Tata Motors and Tata Power today jointly inaugurated India’s largest grid-synchronized, behind-the-meter solar carport at the Tata Motors car plant in Chikhali, Pune. The 6.2 MWp solar carport deployed by Tata Power will generate 86.4 lakh kWh of electricity per year and is estimated to reduce 7,000 tons of carbon emissions annually and 1.6 lakh tons […] Read more
15 MW Nangal Floating Solar Bid Deadline Gets 12th Extension From SECI Updated On Thu, Jun 17th, 2021 by Saurenergy SECI has extended the bid submission deadlines for the 15 MW floating solar plant at Nangal Pond, In Himachal Pradesh’s Bilaspur District, by a further period to July 19, 2021. This should make this the 12th extension for the project now. The tender had first been released in July last year. Power from the project […] Read more
SJVN Partners With NIWE to Develop Solar, Wind & Hybrid Projects Updated On Tue, Jun 15th, 2021 by Saurenergy SJVN Limited has announced signing a Memorandum of Understating (MoU) with the National Institute of Wind Energy (NIWE) to develop various Solar, Wind (solar-wind) Hybrid, and (solar-wind pus battery storage) Hybrid Energy projects. Both organizations have signed the MoU for Technical Consultancy Services for the development of these projects of SJVN. NIWE will Support SJVN […] Read more
Goldi Solar to Expand Capacity to 2.5 GW with New Plant in Gujarat Updated On Tue, Jun 15th, 2021 by Saurenergy Solar Panel manufacturer and EPC provider Goldi Solar has announced its plans to increase its manufacturing capacity to 2.5 GW with a new facility on the outskirts of Surat, Gujarat. Presently, the existing facility has a capacity of 500 MW and the expansion of 2 GW has been planned in two stages. The first phase […] Read more
West Bengal gets 5.4 MW Floating Solar With Sagardighi Project Updated On Fri, Jun 11th, 2021 by Saurenergy West Bengal got the first of what its hopes will be many floating solar plants, with the commissioning of the 5.4 MW Sagardighi plant by Ciel et Terre. PSU Engineering major Bharat Heavy Electricals Limited (BHEL) was the EPC partner for the project. Ciel et Terre is a french floating specialist, and the world’s largest […] Read more
Adani Sets Plans Rolling for Wind Turbine Manufacturing Updated On Wed, Jun 9th, 2021 by Saurenergy Adani Enterprises Ltd (AEL) on Tuesday infirmed the stock exchanges about having incorporated a wholly-owned subsidiary company for manufacturing wind turbine generators. In a filing to BSE, the company said a fully owned subsidiary, Mundra Windtech Limited (MWL) was incorporated on on June 7, 2021. On the objects and effects of acquisition/incorporation for the acquisition of […] Read more
SECI Posts Another Bid Deadline Extension for Solar Tender in Tamil Nadu Updated On Tue, Jun 8th, 2021 by Saurenergy New Delhi-headquartered Solar Energy Corporation of India Limited (SECI) has extended the bid submission deadline for its tender for the design, engineering, supply, construction, erection, testing and commissioning of 50 MW (AC) solar PV project with land having 10 years plant O&M at Tamil Nadu. The last date for bid submission has been extended from June […] Read more