IB Solar Likely To Launch TOPCOn-Based Modules By Oct: Abhinav Mahajan Updated On Mon, Aug 26th, 2024 by Saurenergy What are the main products IB Solar is offering to the Indian solar market currently? Right now, we have a total solar module manufacturing capacity of 500 MW. We are set to add 900 MW of additional capacities in the next six months. We expect our cumulative solar module manufacturing capacity to reach approximately 1.4 […] Read more
NTPC Awards JSW Neo 300 MW Of Hybrid Power Projects Updated On Fri, Aug 23rd, 2024 by Saurenergy JSW Neo Energy Limited (JSW Neo), a subsidiary of JSW Energy Limited, received a Letter of Award (LoA) for a 300 MW ISTS-connected Wind-Solar Hybrid Power Project from NTPC Limited. JSW Neo Energy got this project against a tariff-based competitive bid and was invited to set up 1,000 MW ISTS-connected Wind-Solar Hybrid Power Projects (NTPC-Tranche-VI). […] Read more
Bangalore Discom To Get Solar Power From Pavagada At Rs 2.89/unit Updated On Fri, Aug 23rd, 2024 by Saurenergy JSW Renew Energy Twenty Limited, a subsidiary of JSW Energy Limited, has signed a Power Purchase Agreement (PPA) with Bangalore Electricity Supply Company Limited (BESCOM) for a solar capacity of 300 MW. The project was awarded by the Karnataka Renewable Energy Development Limited (KREDL), the state nodal agency for renewable energy in Karnataka. The power […] Read more
Hindustan Zinc, JNCASR Collaborate For Zinc-Based Batteries Updated On Thu, Aug 22nd, 2024 by Saurenergy Hindustan Zinc Limited, one of India’s leading integrated zinc producer, has signed a Memorandum of Understanding (MoU) with Jawaharlal Nehru Centre for Advanced Scientific Research (JNCASR), an institute sponsored by the Department of Science and Technology. This collaboration aims to develop new variants of zinc materials to propel the commercialization of zinc-based batteries. “At present, […] Read more
GUVNL Issues Tender For 500 MW Solar Projects Updated On Thu, Aug 22nd, 2024 by Saurenergy GUVNL recently released a tender for the procurement of power through a competitive bidding process for a 500 MW Grid Connected Solar Photovoltaic Power Projects to be set up /under construction / already commissioned projects anywhere in India with Greenshoe option of additional capacity up to 500 MW without energy storage. The tender’s last date […] Read more
MSEDCL Seeks Bids To Setup 300 MW/600MWh BESS Pilot Projects Updated On Thu, Aug 22nd, 2024 by Saurenergy The Maharashtra State Electricity Distribution Company Limited (MSEDCL) has issued a tender to set up (300 MW x 2 hours) of BESS capacity within the state, with September 16th set as the last date for technical and financial bids. The state distribution agency seeks to select bidders through a tariff-based global competitive bidding process. The […] Read more
ABB Celebrates 10 GW Automation Milestone For RE Projects In India Updated On Wed, Aug 21st, 2024 by Saurenergy ABB India has surpassed a 10-gigawatt (GW) milestone in delivering its automation solution for renewable energy plants in India. Starting with a 100-MW project about seven years ago, ABB has strengthened its footprint in the renewable energy industry with this milestone, which is a result of over 300 renewable energy projects across India utilizing ABB’s […] Read more
Highview Power Awards Contract To Epcogen To Build LAES facility Updated On Tue, Aug 20th, 2024 by Saurenergy AXISCADES Technologies, a technology and engineering solutions provider, through its subsidiary Epcogen, was awarded a long-term contract by Highview Power Limited, a British energy storage technology producer. Highview Power is a developer of long-duration energy storage technology from renewable sources. Highview Power, which specializes in liquid air energy storage (LAES), has raised capital to establish […] Read more
A 15% Dip In BESS Costs Can Halt New Coal Power Growth: EMBER Updated On Tue, Aug 20th, 2024 by Saurenergy A new modelling by the global think tank Ember and TERI highlights the crucial role of declining Battery Energy Storage System (BESS) project costs. This analysis underscores that faster BESS cost reductions will be a key driver for an effective coal phase-down in India’s power sector. The report lays out different possible stages of a […] Read more