BHEL Tenders for Commissioning of 20 MW Solar Plant in Gujarat Updated On Mon, Nov 2nd, 2020 by Saurenergy BHEL has tendered for the supply of BOS items and the installation and commissioning of a 20 MW grid-connected solar plant at NTPC Gandhar in Gujarat. The Electronics Division of Bharat Heavy Electricals Limited (BHEL) has issued a tender, inviting quotations from eligible firms for the supply of Balance of System (BOS) items and the […] Read more
Okaya Completes Installation of Over 500 EV Chargers, has Orders for 10,000 More Updated On Mon, Nov 2nd, 2020 by Saurenergy Okaya Power has completed the installation of over 500 EV chargers and has over 10,000 charger installation orders with it as well. Energy storage solutions provider Okaya Power has announced that it has completed the installation of over 500 EV chargers for electric vehicles across the country. Besides this, the company has revealed that it has over […] Read more
Pledges to Be Carbon Neutral by Japan, South Korea To Ensure Solar Growth Updated On Thu, Oct 29th, 2020 by Saurenergy The story in India might be depressing, with installations likely to hit a 4 year low this year after the peak of 2017, but the bigger picture for solar remains bright. That is because in the economies that can truly swing the balance, solar remains key to achieving key emission and carbon neutrality goals. Joining […] Read more
Triton-EV Debuts Fully Electric 18-Wheeler Semi Truck Updated On Tue, Oct 27th, 2020 by Saurenergy Triton-EV, the revolutionary new subsidiary of Triton Solar, a leader in solar panel and battery engineering, has announced that it has produced a 100 percent electric-powered, full-service 18-wheeler semi-truck. The truck, which is a hybrid of hydrogen fuels that generate electricity stored in on-board batteries, has a 220,000-pound towing capacity–the same as any comparable diesel truck on […] Read more
Delhi Govt Moves Ahead With EV Charging Infrastructure Plans Updated On Tue, Oct 27th, 2020 by Saurenergy The Delhi Government has been moving ahead with its plan to build an effective EV charging infrastructure across the capital for faster uptake of EVs The Delhi government has been planning to build on an effective Electric Vehicle (EV) charging infrastructure across the national capital for faster uptake of Electric Vehicles (EVs), and recently concluded the second meeting of the ‘Working Group […] Read more
APAC’s RE Capacity to Grow to 815 GW in 2025, led by Solar: Report Updated On Mon, Oct 26th, 2020 by Saurenergy The installed capacity of RE in the Asia-Pacific region is set for a major boost in the next five years, reaching 815 GW in 2025 from 517 GW this year The installed capacity of renewable energy (RE) in the Asia-Pacific (APAC) region is set for a major boost in the next five years, to 815 […] Read more
Foresight, Island GP Form JV to Develop 700 MW Solar Projects in the UK Updated On Fri, Oct 23rd, 2020 by Saurenergy Foresight Group and Island GP have formed a JV to develop a pipeline of greenfield solar projects worth a combined 700 MW across the UK. Foresight Group LLP and Island Green Power (Island GP) have announced the formation of a joint venture (JV) to develop a pipeline of greenfield solar projects across the UK. The […] Read more
SECI Issues RfS for 1200 MW Wind-Solar Hybrid Projects Updated On Fri, Oct 23rd, 2020 by Saurenergy SECI has issued the RfS document for setting up of combined 1200 MW wind-solar ISTS-connected hybrid power projects anywhere in India (Tranche – III). The Solar Energy Corporation of India (SECI) has issued the Request for Selection (RfS) document for the selection of project developers for setting up of combined 1200 MW wind-solar ISTS-connected hybrid […] Read more
MNRE Issues Guidelines for Procurement of Wind-Solar Hybrid Power Updated On Thu, Oct 22nd, 2020 by Saurenergy MNRE has issued the guidelines for the procurement of power/ electricity from wind-solar hybrid power projects through a transparent bidding process. The Ministry of New and Renewable Energy (MNRE) in its latest notification has issued the guidelines for the procurement of power/ electricity from wind-solar hybrid power projects through a transparent bidding process. Addressed to […] Read more