India Requires 13L Charging Stations By 2030: CII Report Updated On Tue, Jul 25th, 2023 by Saurenergy A new report by the Confederation of Indian Industry (CII) on ‘Charging Infrastructure for Electric Vehicles’ claims that India would require around 13 lakh charging stations to cater to the growing electric mobility needs by 2030. It makes a case for the country to install around 4 lakh chargers for EV annually. The industry association […] Read more
GoodWe Launches 100kW Hybrid and Retrofit Battery Inverters for C&I Updated On Thu, Jul 20th, 2023 by Saurenergy GoodWe, the leading inverter manufacturer and energy storage solutions provider, has expanded its C&I energy storage solutions portfolio with two new additions: the ETC 100kW hybrid inverter and the BTC 100kW retrofit battery inverter, both of which can be coupled with GoodWe high-voltage battery system Lynx C (101kWh – 156kWh). With a proven track record […] Read more
BESS BOP Estimation Engineer Updated On Mon, Jul 17th, 2023 by Saurenergy Responsibilities:- Prepare, schedule, coordinate and monitor the Electrical Design activities. Prepare specification document and RFQ’s for sub-contractor and vendors for the products and solutions including civil constructions of sites. Prepare and co-ordinate Division of responsibilities with Civil and construction partners. Equipment design, Selection of equipment’s and work with Sub vendors to meet business Targets. Communicate […] Read more
India Likely To Add 45 GW Of New Renewable Capacities By 2025: Report Updated On Fri, Jul 14th, 2023 by Saurenergy A latest report by CareEdge ratings claimed that India is likely to add 45 Gigawatt (GW) of new renewable energy capacities in the next two fiscals. The rating agency said the estimates were based on the healthy project pipeline and a strong bidding roadmap laid by the government. The report also sheds light on the […] Read more
SECI Floats Tender for 500 MW Solar Projects with ESS Updated On Wed, Jul 12th, 2023 by Saurenergy Solar Energy Corporation of India (SECI) has floated a tender for the selection of select renewable energy developers for the supply of 500 MW of power from interstate transmission system (ISTS)-connected renewable energy projects. The projects comes with Energy Storage System (ESS) all over India. The last day for submission of bids is August 31, […] Read more
Sales Manager, Solar Power Business Updated On Mon, Jul 10th, 2023 by Saurenergy Responsibilities:- Develop business relationships with distribution partners and expanding sales coverage of the company’s products and services in India Design, develop, and implement sales plan to achieve sales target for the country Manage entire selling process, from forecasting and pitching to actual product delivery and payment collection, for your accounts Develop a sales team in […] Read more
SJVN Issues Tender for BOS Package to Set Up 360 MW Solar Projects in Gujarat Updated On Thu, Jul 6th, 2023 by Saurenergy SJVN Green Energy Limited, a wholly-owned subsidiary of SJVN Limited, has issued a tender for the Balance of System (BoS) package including three years of comprehensive operation & maintenance of two grid-connected solar PV power projects of total capacity of 360 MW (AC) at different locations in the state of Gujarat. It has invited online […] Read more
SCADA Engineer Updated On Mon, Jul 3rd, 2023 by Saurenergy Lead the development and design process for all SCADA related topics for solar power plant Support the procurement team with technical expertise throughout different project phases Develop and coordinate the design of monitoring and control systems for utility scale solar PV i.e SCADA units, Power Plant Controller, RTU and IT equipment Specify monitoring equipment, meteorological […] Read more
Govt Proposes To Delicence Transmission Line Setup For Bulk Consumers Updated On Fri, Jun 30th, 2023 by Saurenergy The Ministry of Power has now proposed delicensing establishing, operating and maintaining transmission lines for certain segments of power consumers and electricity generators. It includes bulk power consumers, power generating firms, captive generators, or an energy storage system (ESS). The proposal has featured in the latest Draft Electricity (Amendment) Rules 2023. The ministry has put […] Read more