NTPC Awards JSW Neo 300 MW Of Hybrid Power Projects Updated On Fri, Aug 23rd, 2024 by Saurenergy JSW Neo Energy Limited (JSW Neo), a subsidiary of JSW Energy Limited, received a Letter of Award (LoA) for a 300 MW ISTS-connected Wind-Solar Hybrid Power Project from NTPC Limited. JSW Neo Energy got this project against a tariff-based competitive bid and was invited to set up 1,000 MW ISTS-connected Wind-Solar Hybrid Power Projects (NTPC-Tranche-VI). […] Read more
Bangalore Discom To Get Solar Power From Pavagada At Rs 2.89/unit Updated On Fri, Aug 23rd, 2024 by Saurenergy JSW Renew Energy Twenty Limited, a subsidiary of JSW Energy Limited, has signed a Power Purchase Agreement (PPA) with Bangalore Electricity Supply Company Limited (BESCOM) for a solar capacity of 300 MW. The project was awarded by the Karnataka Renewable Energy Development Limited (KREDL), the state nodal agency for renewable energy in Karnataka. The power […] Read more
MSEDCL Seeks Bids To Setup 300 MW/600MWh BESS Pilot Projects Updated On Thu, Aug 22nd, 2024 by Saurenergy The Maharashtra State Electricity Distribution Company Limited (MSEDCL) has issued a tender to set up (300 MW x 2 hours) of BESS capacity within the state, with September 16th set as the last date for technical and financial bids. The state distribution agency seeks to select bidders through a tariff-based global competitive bidding process. The […] Read more
ABB Celebrates 10 GW Automation Milestone For RE Projects In India Updated On Wed, Aug 21st, 2024 by Saurenergy ABB India has surpassed a 10-gigawatt (GW) milestone in delivering its automation solution for renewable energy plants in India. Starting with a 100-MW project about seven years ago, ABB has strengthened its footprint in the renewable energy industry with this milestone, which is a result of over 300 renewable energy projects across India utilizing ABB’s […] Read more
A 15% Dip In BESS Costs Can Halt New Coal Power Growth: EMBER Updated On Tue, Aug 20th, 2024 by Saurenergy A new modelling by the global think tank Ember and TERI highlights the crucial role of declining Battery Energy Storage System (BESS) project costs. This analysis underscores that faster BESS cost reductions will be a key driver for an effective coal phase-down in India’s power sector. The report lays out different possible stages of a […] Read more
FY25: Waaree Renewable Looks Forward With 2.4 GW Orders Updated On Fri, Aug 16th, 2024 by Saurenergy Waaree Renewable, the EPC arm of the Waaree Group, is now buoyed with a total of 2.4 GW of order book. The company, overwhelmed with its recent orders and its increased interest in government tenders now also expects a plum business for the solar EPC companies in India. The renewable company attributed this to the […] Read more
Delhi’s Grid Flexibility To Cut Peak Demand By 4 GW: RMI Updated On Wed, Aug 14th, 2024 by Saurenergy RMI’s recent report highlighted changes in Delhi’s power grid system, which has utilized grid flexibility technologies to manage and mitigate increasing demand peaks in the city. RMI estimates suggest that by 2030, Delhi could reduce 250–1,350 megawatts (MW) of peak demand through air conditioning (AC) demand response (DR) programs. It is estimated that grid flexibility […] Read more
Sungrow Delivers First BESS PowerTitan 2.0 Units in Europe Updated On Wed, Aug 14th, 2024 by Saurenergy Global energy storage solutions company Sungrow announced the first delivery of the cutting-edge Battery Energy Storage System (BESS), the PowerTitan 2.0 units in Europe. A total of 66 units have arrived in the UK, marking a new beginning in the Bramley 100MW / 330MWh project by Penso Power and BW ESS. The delivery comes less […] Read more
UPPCL Issues Standalone BESS Tender For 300MW/1200MWh Updated On Tue, Aug 13th, 2024 by Saurenergy Uttar Pradesh Power Corporation Limited (UPPCL) has now issued a tender for a standalone Battery Energy Storage System (BESS) project. The state power company has planned to develop 300 MW/1200Mwh of BESS project through this tender. The UPPCL tender document said that the project will be developed on Build-Own-Operate-Transfer (BOOT) basis. The company wants to […] Read more