Manager – Business Finance Updated On Thu, Oct 28th, 2021 by Saurenergy Work in the Business Finance Team on driving various Finance & Digitalisation initiatives Roles and Responsibilities:- Drive and Program manage Digitalisation & Finance transformation initiatives along with process / policy changes Work on various finance related process improvement initiatives (Improved Reporting & Forecasting, Financial Analysis etc.) Work on need based financial and operating performance analysis […] Read more
Best Power Equipments Launches Lithium Powered UPS Systems Updated On Wed, Oct 27th, 2021 by Saurenergy Noida-based Best Power Equipments (India) Pvt Ltd (BPE), a leading power manufacturing brand has recently started offering lithium battery solutions with a 5 year warranty. The Lithium batteries will last longer and recharge faster, saving time, money and reducing risk throughout the lifecycle of the uninterruptible power systems (UPS). Due to its higher reliability, efficiency […] Read more
Cad Technician- Bridges & Civils Updated On Wed, Oct 27th, 2021 by Saurenergy We invite you to bring your strong knowledge of CADS RC & Autocad(2d & 3d) into play as you coordinate with project managers, engineers and other technicians for technical delivery of wide range of engineering drawings for projects of varying complexity. To succeed in this role you must have diploma in Civil Engineering or ITI. […] Read more
Xponent Power Introduces World’s First Power Generating Solar Awning for the RV Industry Updated On Wed, Oct 27th, 2021 by Saurenergy The US, the world’s largest market for recreational vehicles (RV’s) which is worth USD 26.7 billion in 2020, and expected to reach USD 35.7 billion by 2026 (Mordor Intelligence), finally has a solar powered addition too. In 2020, almost 4,30,000 of these truck sized vehicles were sold in the US. But these symbols of excess […] Read more
REIL Floats Tender for 7K Monocrystalline/Mono PERC Solar Modules Updated On Tue, Oct 26th, 2021 by Saurenergy The Rajasthan Electronics and Instruments Limited (REIL) has released a tender, inviting bids to procure 7,000 solar modules of minimum 380 W to 390 W made from 72 monocrystalline or mono PERC silicon solar cells. The deadline to submit bids is November 01, 2021, at 2 pm. The bids will be opened on the next […] Read more
IREDA Opens PLI Bids. Solar Manufacturing Likely To Get Some New Names Updated On Tue, Oct 26th, 2021 by Saurenergy The Solar PLI manufacturing bids have finally been opened by the Indian Renewable Energy Development Agency (IREDA). And the results are really interesting. Not only have relatively new players bid more aggressively making it tougher for incumbents to qualify, but it also sets the stage for a really interesting domestic market. The Solar PLI scheme […] Read more
Replace DG Sets with BESS to Enhance Indian Pwr Grid’s Flexibilty: Study Updated On Wed, Oct 20th, 2021 by Saurenergy “Replacement of DG sets distributed across the country with BESS is the fastest and cheapest route to build flexibility for the Indian grid. The reduction in emissions from DG sets will help meet the NDC targets as well,” states a new study published by India Smart Grid Forum (ISGF). Delivering reliable 24×7 services is the […] Read more
QA Engineer Updated On Mon, Oct 18th, 2021 by Saurenergy Conduct manual testing of energy storage projects developed. On an average 70% of the work is manual testing and 30% on automated testing. Performs technically advanced responsibilities for both manual and automated testing Execute test cases (exploratory or automated) and investigate results Script, maintain and improve project automated tests. Manage and track project and solution […] Read more
Log 9 Materials Partners with Fortum India to Develop EV Charging Infra Updated On Wed, Oct 13th, 2021 by Saurenergy Bengaluru-based advanced battery technology startup Log 9 Materials has partnered with the Indian subsidiary of Finnish clean energy company Fortum to deploy and provide access to public fast chargers for two-wheeler and three-wheeler electric vehicles (EVs) in the country. The partnership will be for a duration of at least 24 months and can thereafter be mutually […] Read more