Solar Mounting Structures: Racking Matters Updated On Thu, Apr 27th, 2017 by Saurenergy Globally, solar installations have been growing at an impressive pace. A large share of growth has been contributed from India, and with 100GW of target by 2022 in its hand, India is on the verge of becoming the world’s biggest solar nation. Continuous reduction in the solar system prices with respect to higher grid rates […] Read more
West Bengal Solar Energy Policy Updated On Thu, Apr 27th, 2017 by Saurenergy TARGET As per MNRE there is a target to harness 5336 MW of solar power through grid connected projects and through rooftop in the state. LAND ALLOTMENT Government land, if available, permission for use will be given for 30 years or the project life whichever is less. Land to be allocated and transferred to WBGEDCL, […] Read more
Jharkhand Yet to Sign PPAs for 1.1 GW of Solar Updated On Thu, Apr 27th, 2017 by Saurenergy The differences on the quoted tariff have halted the signing of the PPA for 1.1 GW solar power project between the state distribution company (DISCOM) and developers in Jharkhand. In Jharkhand, power purchase agreements (PPAs) for 1.1 GW of solar projects that were auctioned in March of 2016 (LoIs signed May 2016) are yet to […] Read more
Jammu and Kashmir Solar Energy Policy Updated On Thu, Apr 27th, 2017 by Saurenergy Jammu and Kashmir Solar Energy Policy Updates 2017 The solar rooftop projects aggregating 450MW will be installed in the state by 2022 has been approved by the state cabinet of Jammu & Kashmir as per the solar rooftop policy 2016 to be followed for a 10-year period implemented in accordance with the provisions of Jammu […] Read more
Uttar Pradesh Solar Energy Policy Updated On Wed, Apr 26th, 2017 by Saurenergy Uttar Pradesh Solar Energy Policy Updates 2017 A target of 10,700 MW for solar power, including 4,300 MW from rooftop solar projects, by FY 2022 has been set by the Government of Uttar Pradesh mentioned in the ‘Draft Solar Power Policy-2017’ for Uttar Pradesh in June 2017. At the time of announcing the policy remains […] Read more
Tamil Nadu Solar Energy Policy Updated On Wed, Apr 26th, 2017 by Saurenergy Tamil Nadu Solar Energy Policy Updates 2017 Tamil Nadu became the 21st state to join the UDAY program in January 2017. Distribution company debt of Rs. 304.2 billion (~$4.48 billion) will be taken over by the state government. The Tamil Nadu Electricity Regulatory Commission (TNERC) has fixed Rs. 4.50 (~$0.066)/kWh as the new benchmark tariff […] Read more
Canadian Solar Supplies 10 MW of PV Modules to Soroti Photovoltaic Solar Plant in Uganda Updated On Wed, Apr 26th, 2017 by Saurenergy The Soroti Photovoltaic solar plant consists of 32,000 pieces of Canadian Solar high-efficiency poly panels. Canadian Solar has announced that the company has supplied 10 MW of PV Modules to Soroti Photovoltaic Plant in Uganda. The solar project is the largest of its kind in East Africa and was officially inaugurated at the end of […] Read more
Odisha Solar Energy Policy Updated On Wed, Apr 26th, 2017 by Saurenergy OBJECTIVE Objectives of Odisha Solar energy policy 2013 includes:- Productive use of wastelands, thereby utilizing the non-industrialized areas that receive abundant sunshine for creation of Solar power hubs. Creating favorable conditions to Solar manufacturing capabilities by providing fiscal incentives. APPLICABILITY LAND BASED SOLAR PROJECTS Various industries, CPPs, IPPs have been allotted with huge chunks of […] Read more
Himachal Pradesh Solar Energy Policy Updated On Wed, Apr 26th, 2017 by Saurenergy OBJECTIVE Promote generation of electricity from solar energy for energy security for sustainable development, which is the core Development Policy of the State. Contribute to the National objective of increasing the share of Renewable Energy in total energy consumption, in accord-ance with climate, environment and macro-economic considerations. Strengthen and sustain the Policy of 100% clean […] Read more