1 TW Renewable Potential in Egypt: A Game-Changer or a Distant Dream? Updated On Fri, Aug 4th, 2023 by Saurenergy Egypt has the potential to produce electricity capacity of 350 gigawatts (GW) from wind energy and 650 GW from solar energy, the Minister of Electricity and Renewable Energy Mohamed Shaker suggested at the fourth edition of the round table on the green hydrogen industry in Egypt, chaired by Egypt’s Prime Minister Mostafa Madbouly. The claim […] Read more
KPI Green Energy Emerges Winner for 200 MW Project in GUVNL Tender Updated On Fri, Aug 4th, 2023 by Saurenergy KPI Energy has emerged as the winner in the Gujarat Urja Vikas Nigam Limited (GUVNL) tender for development of a solar photovoltaic power project. The firm had participated in the competitive bidding process for the “Purchase of power through competitive bidding process vide RFS No. GUVNL / 800 MW / Khavda / Solar (PhaseXX)” issued […] Read more
Apraava Energy Bags Two Green Energy Interstate Transmission Projects in Rajasthan Updated On Thu, Aug 3rd, 2023 by Saurenergy Apraava Energy, a leading integrated energy solutions provider, has been awarded two interstate transmission projects in Rajasthan under the GoI’s tariff-based competitive bidding process. In line with the Transmission Service Agreement executed by the SPVs, the projects will be developed by Apraava under BOOT (build, own, operate and transfer) model. The projects are part of […] Read more
TPREL Signs PPAs with MSEDCL for 200 MW & 150 MW Solar Projects Updated On Wed, Aug 2nd, 2023 by Saurenergy Tata Power Renewable Energy Limited (TPREL), a firm that delves into the renewable energy sector and a subsidiary of Tata Power, has signed two significant Power Purchase Agreements (PPAs) with Maharashtra State Electricity Distribution Company Ltd. (MSEDCL) for commissioning two solar power projects, 200 MW and 150 MW, respectively. Located in Maharashtra, these projects of […] Read more
Five Indian States Take 87% Of PM-KUSUM Benefits Updated On Wed, Aug 2nd, 2023 by Saurenergy Latest data from the government claims that Rajasthan, Haryana, Uttar Pradesh, Punjab, and Madhya Pradesh account for 87.24 percent of the total benefits under the PM-KUSUM scheme. It is indicated from the total number of solar pumps installed under Component B of the scheme. The statistics up to June 30, 2023, claimed that India installed […] Read more
AIIMS-Delhi Adopts Jakson’s Solar Rooftop Solution Updated On Wed, Aug 2nd, 2023 by Saurenergy Jakson Group, an energy and infrastructure firm, headquartered at Noida, has collaborated with AIIMS, Delhi to go green with a solar rooftop solution. This 9 KW project, on the rooftop of AIIMS Director’s Bungalow, has been developed under the aegis of Jakson Welfare Trust, the CSR arm of Jakson Group. The project was inaugurated recently […] Read more
Swiss Storage Firm Energy Vault Commissions First Gravity Energy Storage System In China Updated On Wed, Aug 2nd, 2023 by Saurenergy The world’s first grid-scale EVx™ gravity energy storage system (GESS) has entered the first phases of commissioning. Energy Vault Holdings, a firm that delves in sustainable, grid-scale energy storage solutions, has announced the commissioning of the project, along with its partners Atlas Renewable and China Tianying (CNTY). Located outside of Shanghai in Rudong, Jiangsu Province, […] Read more
SaurEnergy Explains- From Coal to Clean: Past, Present, & Future of India’s Renewable Energy Updated On Wed, Aug 2nd, 2023 by Saurenergy India has come a long way from its fossil fuel-based economy to becoming the nation with the fourth-largest installed capacity of renewable energy in the world. Coal and oil have so far served as the bedrock of India’s industrial growth and modernisation, giving a rising number of Indian people access to modern energy services. This […] Read more
CEA Amends Norms To Offer RTM For Cross-Border Power Trading Updated On Tue, Aug 1st, 2023 by Saurenergy The Central Electricity Authority (CEA), in its recent order, has amended the procedures for approval and facilitation of the import and export of electricity with neighbouring countries. The order said that the move was taken to accommodate the participation of the Real-Time Market (RTM) segment in addition to the existing Day-Ahead Market (DAM) for electricity […] Read more