Ashok Leyland, ABB Ink MoU in E-Mobility Space Updated On Mon, Jan 20th, 2020 by Saurenergy Hinduja Group’s flagship firm Ashok Leyland entered into a Memorandum of Understanding (MoU) in the public e-mobility space with ABB Power Products and Systems India Ltd. Through this MoU, the two companies aimed to expand the eco-system for efficient and greener electric bus (e-bus) transportation systems in India. The motive behind the agreement was to […] Read more
Waaree Breathes Easy As Bid for 184 MW Project Gets MERC Approval Updated On Wed, Jan 15th, 2020 by Saurenergy Waaree Energies Limited (WEL), which had emerged as the sole bidder in the much postponed tender for 184 mw of solar power in Maharashtra can finally get started on the project. This follows the approval of its bid of Rs 3.05 per unit under the tender by the Maharashtra Electricity Regulatory Commission (MERC). The tender […] Read more
MNRE Shares List of Insurance Providers for Solar Power Plants Updated On Wed, Jan 8th, 2020 by Saurenergy With an aim to provide some relief to solar energy industry stakeholders, the Ministry of New and Renewable Energy (MNRE) has shared a list of those insurers who are currently offering products covering various risks associated with the solar power plants. The MNRE said in a statement that it had taken up with the Department […] Read more
CEL Tenders for Supply of 5 MW Solar Modules for Maharashtra Projects Updated On Mon, Dec 30th, 2019 by Saurenergy CEL tenders for the supply of 5 MW multi-crystalline solar PV modules, to be supplied at various substations in various districts of Maharashtra. The Central Electronics Limited (CEL) has issued a tender for the supply of 5 MW multi-crystalline solar PV modules (72 Si solar cells), to be supplied at various substations in various districts […] Read more
MNRE Missing Yearly RE Targets, 175 GW by 2022 in Danger: Parliamentary Panel Updated On Mon, Dec 9th, 2019 by Saurenergy MNRE has continuously failed to achieve its yearly targets of clean energy capacity addition, which may hamper the mission of having 175 GW of RE by 2022. The Ministry of New and Renewable Energy (MNRE) has continuously failed to achieve its yearly targets of clean energy capacity addition, which may hamper the mission of having 175 […] Read more
NTPC Tenders for 500 MW Solar Projects in Maharashtra Updated On Fri, Dec 6th, 2019 by Saurenergy NTPC has tendered for the development of grid-connected solar power projects up to 500 MW in generational capacity in Maharashtra under EPC package NTPC Limited has issued a tender, inviting bids from eligible bidders for the development of grid-connected solar power projects up to 500 MW in generational capacity in Maharashtra under Engineering, Procurement and […] Read more
Missing. A Public Presence for Renewable Firms in India Updated On Mon, Dec 2nd, 2019 by Saurenergy Back in March 1999, when Infosys Limited, the software firm that was just beginning to get noticed listed on the Nasdaq stock market in the US, it was a seminal moment for the firm and the Indian IT sector in general. Not only did the firm become the first Indian firm to list on NASDAQ, […] Read more
Solar Inverters Ready For the Spotlight Updated On Fri, Nov 22nd, 2019 by Saurenergy For most people, thinking of solar usually brings to mind solar panels, the distinctive signature of solar energy. But this story takes a look at another critical part of the solar chain, the inverters. These devices, tasked with the job of converting DC power to AC and more, have been largely taken for granted, even […] Read more
ADB Grants $451 Mn to Strengthen Power Connectivity in Tamil Nadu Updated On Thu, Nov 7th, 2019 by Saurenergy ADB has approved a USD 451 million loan to strengthen power connectivity between the southern and northern parts of the CKIC in Tamil Nadu The Asian Development Bank (ADB) has approved a USD 451 million loan to strengthen power connectivity between the southern and northern parts of the Chennai–Kanyakumari Industrial Corridor (CKIC) in Tamil Nadu, […] Read more